← Public RFP analyses

Fiber Optics Connection from the Fresno-Clovis Regional Wastewater Reclamation Facility to City Hall Data Center

Source scope cues include: City of Fresno Community Workforce; City of Fresno; bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until A250090 2025-01 CPDNoFedPLADivI i rev. 07.25 a Contract has been executed w; Wastewater Reclamation Facility to the City Hall Data Center.; and performing repair work to the existing conduit as necessary; installing 144 ct.; cable and terminating fiber optics at both ends.; click on “City Clerk”, then click on “Fresno Municipal Code” located in the middle of the page.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; Resolution setting forth facts constituting the emergency or necessity.; 4 Exclusions: The following shall be excluded from the scope of this Agreement.; Code and the applicable state prevailing wage determination.; labor arbitrator, the City and the Trades Council shall mutually agree to a replacement.; and non-owned automobiles or other licensed vehicles (Code 1- Any Auto).; responsible for the payment of any deductibles or self-insured retentions.; insurance company endorsement providing additional insured status.; completed, submittals are approved, and permits issued in order for the work to commence.; approved invoices of the Mediator actually billed to Owner by Contractor.; where specified otherwise in Specifications or required permits.; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; 2600 Fresno Street, Fresno CA.

BID WITH CAUTION 19 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Fresno Community Workforce; City of Fresno; bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until A250090 2025-01 CPDNoFedPLADivI i rev. 07.25 a Contract has been executed w; Wastewater Reclamation Facility to the City Hall Data Center.; and performing repair work to the existing conduit as necessary; installing 144 ct.; cable and terminating fiber optics at both ends.; click on “City Clerk”, then click on “Fresno Municipal Code” located in the middle of the page.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; Resolution setting forth facts constituting the emergency or necessity.; 4 Exclusions: The following shall be excluded from the scope of this Agreement.; Code and the applicable state prevailing wage determination.; labor arbitrator, the City and the Trades Council shall mutually agree to a replacement.; and non-owned automobiles or other licensed vehicles (Code 1- Any Auto).; responsible for the payment of any deductibles or self-insured retentions.; insurance company endorsement providing additional insured status.; completed, submittals are approved, and permits issued in order for the work to commence.; approved invoices of the Mediator actually billed to Owner by Contractor.; where specified otherwise in Specifications or required permits.; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; 2600 Fresno Street, Fresno CA.

Submission deadline

2026-02-10

Red flag teaser

19 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

19 found

Back-Charge / Setoff Rights

high

…or. As an alternative to payment of such claims or obligations, City, in its sole discretion, may reduce the total Contract price or set-off the amount against payments due. WAIVER AND RELEASE FORMS Consistent with the provisions of California Civil Code Chapter 3 – Waiver and Release [8120 – 8138], the Contractor and its subcontractors shall promptly furnish the City with a release of all claims

Broad Indemnification

high

…m the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker. If a Bidder refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be fin

Hazardous Material / Abatement Coordination

high

…r to the expiration date of the expiring policy. (ii) In the event this Contract involves any lead-based environmental hazard (e.g., lead based paint), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for lead based environmental hazards. In the event this Contract involves any asbestos environmental hazard (e.g., asbestos remediation), the Contractors Po

Lien Waiver / Waiver of Lien Rights

high

…he Contract Documents; or (iii) terms of special warranties required by the Contract Documents. Contractor shall promptly provide an unconditional waiver and release upon final payment in accordance with California Civil Code section 3262 and these Contract Documents. Except to the extent of any Claim arising from City’s sole or active negligence, and except to the extent Contractor expressly des

Liquidated Damages

high

…Proposal Form .......................................................................................... 1.2 Time of Completion and Liquidated Damages ................................................ 1.4 Time Period to Award Bid ............................................................................... 1.4 List of Subcontractors ...............................................................

Locked analysis

All deadlines table

2 dates
ItemDue
SCHEDULED BID OPENING 2026-02-10
A pre-bid conference will be held at 11:00 AM, on Thursday, 2026-01-22

Locked analysis

Required certifications checklist

24 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all