F.E. Weymouth Water Treatment Plant Administration and Control Buildings Seismic Upgrades and Building Improvements

Source scope cues include: City of Los Angeles; City of Los Angeles shall; 25 years from date of final completion and acceptance. 2. Roller Shade Motors and Control Systems: a. Warranty Period: 5 years from date of final completion and acceptance. PART...; Mechanical splices shall be positive locking, threaded type couplers.; Mechanical splices shall be installed in accordance with manufacturer’s printed instructions and recommendations.; Product Data: The Contractor shall submit manufacturer's standard catalog data sheets.; Repairs: Repair products, methods, and procedure as required.; Materials shall be delivered in sealed containers with labels legible and intact.; Mechanical anchors will not be permitted in locations that will be submerged in water, fluids, or chemicals.; Shims, wedges, or other leveling devices are removed, if required, and necessary repairs are made.; Apply proof test loads to mechanical anchors without removing the nut, if possible.; The Contractor shall repair area damaged by drilling or testing of anchors.; cost to Metropolitan, and repair methods and procedure shall be subjected to the Engineer’s approval.; submit repair products, methods, and procedure for the Engineer’s authorization.; installation, and repair shall be submitted.; all expansion and construction joints of roof slabs, walls, and floor slabs.; Bituminous-fiber joint material shall be used only where called for on the drawings.; Repair of damaged waterstops will be subject to the approval of the Engineer.; Water Treatment Plant; 5151 Beltline Road, Suite; 3201 Wheeler Avenue, La Verne, CA; electrical contractor; Roofing Contractors.

BID WITH CAUTION 9 red flags detected : BOLI / Davis-Bacon Prevailing Wage Requirement

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles; City of Los Angeles shall; 25 years from date of final completion and acceptance. 2. Roller Shade Motors and Control Systems: a. Warranty Period: 5 years from date of final completion and acceptance. PART...; Mechanical splices shall be positive locking, threaded type couplers.; Mechanical splices shall be installed in accordance with manufacturer’s printed instructions and recommendations.; Product Data: The Contractor shall submit manufacturer's standard catalog data sheets.; Repairs: Repair products, methods, and procedure as required.; Materials shall be delivered in sealed containers with labels legible and intact.; Mechanical anchors will not be permitted in locations that will be submerged in water, fluids, or chemicals.; Shims, wedges, or other leveling devices are removed, if required, and necessary repairs are made.; Apply proof test loads to mechanical anchors without removing the nut, if possible.; The Contractor shall repair area damaged by drilling or testing of anchors.; cost to Metropolitan, and repair methods and procedure shall be subjected to the Engineer’s approval.; submit repair products, methods, and procedure for the Engineer’s authorization.; installation, and repair shall be submitted.; all expansion and construction joints of roof slabs, walls, and floor slabs.; Bituminous-fiber joint material shall be used only where called for on the drawings.; Repair of damaged waterstops will be subject to the approval of the Engineer.; Water Treatment Plant; 5151 Beltline Road, Suite; 3201 Wheeler Avenue, La Verne, CA; electrical contractor; Roofing Contractors.

Submission deadline

Not listed in the public preview.

Red flag teaser

9 red flags detected including BOLI / Davis-Bacon Prevailing Wage Requirement.

Locked analysis

Full red flag list with excerpts

9 found

BOLI / Davis-Bacon Prevailing Wage Requirement

high

…construction joints in structures downward from a point 6 inches above the adjacent finished grade elevation or maximum water level, whichever is higher in elevation. Unless specified or shown otherwise on the drawings, horizontal construction joints in walls and between walls and slabs do not require waterstop. In structures conveying or containing water or chemicals, waterstops shall be placed

Hazardous Material / Abatement Coordination

high

…Action 24. Inspection 60. Differing or Unusual Site Conditions 25. Examination of Work 61. Hazardous Substance, Hazardous Waste, or Asbestos- 26. Defective Work or Material Related Work 27. Right of Property in Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents a

Liquidated Damages

high

…n Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents and Copyrights 66. Non-Use of Intellectual Property of Third Parties 32. No Payment for Temporary or Preliminary Works 67. Prohibited Relationships with Sanctioned Countries 33. Partial Estimates and Persons 34

No Material Substitutions Without Owner Approval

high

…d Fasteners, ICC ESR-2138, LARR #25469 4. Dewalt/Powers Powers-Driven Fasteners, ICC ESR-2024, LARR #25304. 5. Or approved equal. E. Substitution of specified anchors with equivalent products shall be approved by the Structural Engineer for each specific use. F. Do not install any power driven shot pins in the region of externally applied Fiber Reinforced Polymer (FRP) reinforcing. PART 3 EXECUTI

Background Check / Drug Testing Requirement

medium

…respass Completion 50. Character of Workers 14. Termination of Contract for Convenience 51. Employment of Labor 15. Right-of-Way 52. Substance Abuse Policy 16. Obligations of Contractor 53. Safety and Protection 17. Personal Attention 54. Laws and Regulations 18. Protest and Claims Procedure 55. Employment of Indentured Apprentices 19. Contractor's Responsibilities for Losses or Liabilities 56. S

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

10 items
  • Include payment bond
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include references or past project experience
  • Include subcontractor list if required
  • Include safety documents if required
  • Verify requirement: Workers Compensation Insurance
  • Resolve before bid: BOLI / Davis-Bacon Prevailing Wage Requirement

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all