← Public RFP analyses

Ely Basin 3 - Fence Improvement, Project Number EN21057

Source scope cues include: PREVAILING WAGE ------------------------------------------------------------------------------------------------ 7 O. INDEMNIFICATION; PlanetBids. Last Day for Questions will be End of Business July 19, 2022 4 H. BID SUBMITTAL: Any bid found to be illegible or incomplete may be rejected. Bidders assume full res...; work given by Inland Empire Utilities Agency.; services are repaired or corrected, and accepted, by the Project Manager.; in conjunction with this solicitation will be subject to prevailing wage.; components of proposed prices and/or invoices, i.; by the Agency will be taken as a direct credit against the Contractor’s invoice for this project.; The attached plans/specifications within this document are part of the contract scope.; 1951 Philadelphia St.

BID WITH CAUTION 9 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: PREVAILING WAGE ------------------------------------------------------------------------------------------------ 7 O. INDEMNIFICATION; PlanetBids. Last Day for Questions will be End of Business July 19, 2022 4 H. BID SUBMITTAL: Any bid found to be illegible or incomplete may be rejected. Bidders assume full res...; work given by Inland Empire Utilities Agency.; services are repaired or corrected, and accepted, by the Project Manager.; in conjunction with this solicitation will be subject to prevailing wage.; components of proposed prices and/or invoices, i.; by the Agency will be taken as a direct credit against the Contractor’s invoice for this project.; The attached plans/specifications within this document are part of the contract scope.; 1951 Philadelphia St.

Submission deadline

2022-07-14

Red flag teaser

9 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

9 found

Broad Indemnification

high

…--------- 7 N. PREVAILING WAGE ------------------------------------------------------------------------------------------------ 7 O. INDEMNIFICATION ------------------------------------------------------------------------------------------------- 7 P. STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION: UNLESS NOTED ------------- 8 Q. AWARD / SELECTION CRITERIA ----------------------------------

Liquidated Damages

high

…-- 8 R. BID PRICE-------------------------------------------------------------------------------------------------------------- 8 S. LIQUIDATED DAMAGES ------------------------------------------------------------------------------------------ 9 T. FORCE ACCOUNT WORK ----------------------------------------------------------------------------------------- 9 SECTION 3 - SCOPE OF WORK ..............

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…is estimate as they prepare costs for this work. ENGINEER’S ESTIMATE of PROBABLE COST = $30,000 C. PRE-BID and JOB-WALK MEETING: Non-Mandatory PRE-BID MEETING and JOB-WALK: 10:00 AM, July 14, 2022, Ely Basin 3 Address: 1951 Philadelphia St., Ontario 91761 D. SUBMITTAL LOCATION, CLOSING DATE, AND TIME: Bids will not be accepted after the “closing” date and time indicated. . Only electronic bids su

Prevailing Wage / Certified Payroll

high

…----------------------------------------- 7 M. EQUAL EMPLOYMENT OPPORTUNITY AND HARASSMENT PROHIBITION ------------------------ 7 N. PREVAILING WAGE ------------------------------------------------------------------------------------------------ 7 O. INDEMNIFICATION ------------------------------------------------------------------------------------------------- 7 P. STANDARD SPECIFICATION FOR PU

Time is of the Essence / Strict Completion Deadline

high

…of IEUA ____________ (___ ) calendar days after Award of the Contract. All Work shall be completed before final payment is made. G. Time is of the essence on this Contract. H. CONTRACTOR agrees that in case the Work is not completed before or upon the expiration of the Contract Time, damage will be sustained by IEUA, and that it is and will be impracticable to determine the actual damage which IE

Locked analysis

All deadlines table

2 dates
ItemDue
PRE-BID MEETING and JOB-WALK: 10:00 AM, 2022-07-14
via PlanetBids. Last Day for Questions will be End of Business 2022-07-19

Locked analysis

Required certifications checklist

23 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all