ELECTRICAL CONDUIT & STRUCTURES INSTALLATION FOR HMPE CABLE REPLACEMENT CANYON CREST AREA 5

Source scope cues include: City of Riverside is seeking; City of Riverside; bid bond in the amount of 10% of the proposed contract price which must also be uploaded by the due date and time. If Bid guarantee is in the form of a Cashier's Check,; Bond requirements. Listing of bonding companies in U.S. Department of Treasury Circular 570 is not required, but the corporate surety must be authorized to issue the bonds in th...; SECTION 2 - SCOPE AND CONTROL OF THE WORK .; LOCATED AT CANYON CREST AREA 1F (PHASE3).; NO HARD COPY BIDS WILL BE ACCEPTED.; and repair services for civil and electric utility services as listed above.; number of an agent located in the State of California who is authorized to act for the bonding company.; gov/utilities/developers/electric-engineering-underground-construction.; grounding, waterproofing, cable racking and labeling per Specification 2-6.; sidewalks, wheelchair ramps, driveways, cross gutters, and other improvements.; subcontractor or other forces, from the supplier thereof as evidenced by supplier’s invoice.; Material charges shall be substantiated by valid copies of vendor's invoices.; order to have underground installations marked by all utilities.; 6-8 COMPLETION, ACCEPTANCE AND WARRANTY.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 2911 Adams Street, Riverside, California.

BID WITH CAUTION 17 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside is seeking; City of Riverside; bid bond in the amount of 10% of the proposed contract price which must also be uploaded by the due date and time. If Bid guarantee is in the form of a Cashier's Check,; Bond requirements. Listing of bonding companies in U.S. Department of Treasury Circular 570 is not required, but the corporate surety must be authorized to issue the bonds in th...; SECTION 2 - SCOPE AND CONTROL OF THE WORK .; LOCATED AT CANYON CREST AREA 1F (PHASE3).; NO HARD COPY BIDS WILL BE ACCEPTED.; and repair services for civil and electric utility services as listed above.; number of an agent located in the State of California who is authorized to act for the bonding company.; gov/utilities/developers/electric-engineering-underground-construction.; grounding, waterproofing, cable racking and labeling per Specification 2-6.; sidewalks, wheelchair ramps, driveways, cross gutters, and other improvements.; subcontractor or other forces, from the supplier thereof as evidenced by supplier’s invoice.; Material charges shall be substantiated by valid copies of vendor's invoices.; order to have underground installations marked by all utilities.; 6-8 COMPLETION, ACCEPTANCE AND WARRANTY.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 2911 Adams Street, Riverside, California.

Submission deadline

2022-01-07

Red flag teaser

17 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

17 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…hereby relieved at all times from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS. 2-3.1 General. The following list includes designated specialty items that a

Hazardous Material / Abatement Coordination

high

…t for the Project Work: 1. Pumping and Disposal of Contaminated Water from underground structures. 2. Cleanup and proper Disposal of any EPA designated Hazardous materials (PCB contaminated oil, lead, asbestos etc.) 3. Landscaping planting and irrigation systems SPECIAL PROVISIONS BID NO. RPU-7894 - ELECTRICAL CONDUIT & STRUCTURES INSTALLATION FOR HMPE CABLE REPLACEMENT CANYON SP - 11 CREST AREA

Liquidated Damages

high

…ractor and establishes the termination of the time period for construction, and this date is used as a basis for determining whether liquidated damages are assessable. When Contractor believes construction of the Work is Substantially Complete, Contractor shall call for an inspection. The Inspector will inspect the Work to verify its completion by Contractor. If in the Inspector’s opinion, there

No Material Substitutions Without Owner Approval

high

…s found not to be equal to material specified, it shall be removed and replaced with the material originally specified or some other substitution as approved by the Engineer, all at no additional cost to City, and with no change in contract time. SECTION 5 - UTILITIES 5-1 LOCATION. Contractors shall use the one-call telephone number, 1-800-227-2600, of Underground Service Alert (USA) in order to

Locked analysis

All deadlines table

5 dates
ItemDue
Request for Bid Documents 2022-01-07
Non-Mandatory Virtual Pre-Bid Meeting 2022-01-19
Final Questions Due 2022-01-25
Responses to Questions Released 2022-01-28
Bids Due 2022-02-03

Locked analysis

Required certifications checklist

27 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all