← Public RFP analyses

Eagle Rock Operation Control Center Building Roof Replacement

Source scope cues include: City of Los Angeles Bureau; City Of Los Angeles Municipal; planetbids.com/portal/portal; sealed proposal; The total roof area of the two buildings is approximately 6,170 square feet.; Section 07540 – Single-Ply PVC Membrane Roofing.; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; proper invoices, bills of lading, etc.; Electrical Contractors; plumbing contractor.

BID WITH CAUTION 17 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles Bureau; City Of Los Angeles Municipal; planetbids.com/portal/portal; sealed proposal; The total roof area of the two buildings is approximately 6,170 square feet.; Section 07540 – Single-Ply PVC Membrane Roofing.; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; proper invoices, bills of lading, etc.; Electrical Contractors; plumbing contractor.

Submission deadline

2017-10-18

Red flag teaser

17 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

17 found

Broad Indemnification

high

…from all claims of any kind arising directly or indirectly out of the performance of the work. (f) Indemnity. — The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind which may arise from or in connection with MWD Standard Document 00700-12 MS October 14, 2016

Hazardous Material / Abatement Coordination

high

…or Material 60. Differing or Unusual Site Conditions 27. Right of Property in Materials 61. Hazardous Substance, Hazardous Waste, or Asbestos- 28. Title to Materials Found on the Work Related Work 29. Access to Work 62. Hazardous Material 30. Liquidated Damages 63. Hazardous Waste 31. Patents and Copyrights 64. Insurance 32. No Payment for Temporary or Preliminary Works 65. Payrolls and Records 3

Liquidated Damages

high

…e, Hazardous Waste, or Asbestos- 28. Title to Materials Found on the Work Related Work 29. Access to Work 62. Hazardous Material 30. Liquidated Damages 63. Hazardous Waste 31. Patents and Copyrights 64. Insurance 32. No Payment for Temporary or Preliminary Works 65. Payrolls and Records 33. Partial Estimates 66. Non-Use of Intellectual Property of Third Parties 34. Partial Estimates May Be Withhe

Prevailing Wage / Certified Payroll

high

…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records it is requ

Project Labor Agreement / Union Requirements

high

…but not limited to, compensation insurance, and social security payments. (3) The amount paid for subsistence and travel required by collective bargaining agreements, or in accordance with the regular practice of the employer. At the beginning of the Contract and as later requested by the Engineer, the Contractor shall furnish the Engineer proof of labor compensation rates being paid or paid. (e)

Locked analysis

All deadlines table

1 dates
ItemDue
Figueroa Street, Los Angeles, California 90041 at 10:00 a.m., 2017-10-18

Locked analysis

Required certifications checklist

22 items
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include W-9 or taxpayer information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all