← Public RFP analyses

DRILLED PIER INSTALLATION FOR RIVERSIDE 69 kV LINE RELOCATION PROJECT (RCOE)

Source scope cues include: City of Riverside is seeking; City of Riverside; bid bond in the amount of 10% of the proposed contract price which must also be uploaded by the due date and time. If Bid guarantee is in the form of a Cashier's Check,; Bond requirements. Listing of bonding companies in U.S. Department of Treasury Circular 570 is not required, but the corporate surety must be authorized to issue the bonds in th...; SECTION 2 - SCOPE AND CONTROL OF THE WORK .; NO HARD COPY BIDS WILL BE ACCEPTED.; name, that provide services of similar type and scope as described in the Scope of Services.; construction, maintenance and repair services for civil and electric utility services as listed above.; licensed shall result in rejection of the proposal as non-responsive.; (PCB contaminated oil, lead, asbestos etc.; telephone number of an agent located in the State of California who is authorized to act for the bonding company.; Material charges shall be substantiated by valid copies of vendor's invoices.; order to have underground installations marked by all utilities.; 6-8 COMPLETION, ACCEPTANCE AND WARRANTY.; shall be final in determining whether an operational emergency exists.; prevailing wage rates, but only for the period beyond that stipulated in Section 6-7.; Provide Additional Insured Endorsement.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, which schedule is open for inspection to any.

BID WITH CAUTION 16 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside is seeking; City of Riverside; bid bond in the amount of 10% of the proposed contract price which must also be uploaded by the due date and time. If Bid guarantee is in the form of a Cashier's Check,; Bond requirements. Listing of bonding companies in U.S. Department of Treasury Circular 570 is not required, but the corporate surety must be authorized to issue the bonds in th...; SECTION 2 - SCOPE AND CONTROL OF THE WORK .; NO HARD COPY BIDS WILL BE ACCEPTED.; name, that provide services of similar type and scope as described in the Scope of Services.; construction, maintenance and repair services for civil and electric utility services as listed above.; licensed shall result in rejection of the proposal as non-responsive.; (PCB contaminated oil, lead, asbestos etc.; telephone number of an agent located in the State of California who is authorized to act for the bonding company.; Material charges shall be substantiated by valid copies of vendor's invoices.; order to have underground installations marked by all utilities.; 6-8 COMPLETION, ACCEPTANCE AND WARRANTY.; shall be final in determining whether an operational emergency exists.; prevailing wage rates, but only for the period beyond that stipulated in Section 6-7.; Provide Additional Insured Endorsement.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, which schedule is open for inspection to any.

Submission deadline

2022-10-04

Red flag teaser

16 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

16 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…hereby relieved at all times from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS. 2-3.1 General. The following list includes designated specialty items that a

Hazardous Material / Abatement Coordination

high

…r from underground structures. 2. Cleanup and proper Disposal of any EPA designated Hazardous materials (PCB contaminated oil, lead, asbestos etc.) 3. Landscaping planting and irrigation systems 4. Testing services to test contamination levels of EPA designated hazardous materials of electric equipment, water accumulation in underground electric structures, or soil adjacent to leaking electric eq

Liquidated Damages

high

…ractor and establishes the termination of the time period for construction, and this date is used as a basis for determining whether liquidated damages are assessable. When Contractor believes construction of the Work is Substantially Complete, Contractor shall call for an inspection. The Inspector will inspect the Work to verify its completion by Contractor. If in the Inspector’s opinion, there

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…ased 10/24/2022 N/A Bids Due 11/01/2022 Before 2:00 p.m. PDT All prospective Companies are highly encouraged to attend a virtual non-mandatory pre-bid meeting on October 12, 2022, at 9:00 am via MS Teams. Prospective Companies shall be responsible for downloading and having available a working version of MS Teams. Please click on the following link to attend the pre-bid meeting: https://teams.mic

Locked analysis

All deadlines table

5 dates
ItemDue
Request for Bid Documents 2022-10-04
Non-Mandatory Virtual Pre-Bid Meeting 2022-10-12
Final Questions Due 2022-10-19
Responses to Questions Released 2022-10-24
Bids Due 2022-11-01

Locked analysis

Required certifications checklist

27 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all