← Public RFP analyses

Design-Build IERCF Wash Pad Cover

Source scope cues include: City of Rancho Cucamonga as; City of Rancho Cucamonga and; sealed envelope with all the original; PREVAILING WAGE ---------------------------------------------------------------------------------------------------- 6 O. INDEMNIFICATI; sealed proposal; work given by Inland Empire Utilities Agency.; INQUIRIES: Technical inquiries regarding this solicitation should be directed to PlanetBids.; BID LABELING: The bid shall be submitted in a sealed envelope with all the original pages intact.; until such services are repaired or corrected, and accepted, by the Project Manager.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; itemize/detail components of proposed prices and/or invoices; i.; compressor, providing lighting as well electrical outlets throughout the structure.; Warranty shall be as noted or be greater.; permits shall be submitted to the Agency.; warranty for up to a one-year period following Notice of Completion.; banks by hand pudding (No mechanical vibration).; Permits issued by the jurisdictional regulatory agencies, if applicable.; Pipeline curves should show clear curve data which includes the BC, EC, and curve geometry.; 6075 Kimball Avenue, Building; 6075 Kimball Ave; Electrical Contractors.

BID WITH CAUTION 10 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Rancho Cucamonga as; City of Rancho Cucamonga and; sealed envelope with all the original; PREVAILING WAGE ---------------------------------------------------------------------------------------------------- 6 O. INDEMNIFICATI; sealed proposal; work given by Inland Empire Utilities Agency.; INQUIRIES: Technical inquiries regarding this solicitation should be directed to PlanetBids.; BID LABELING: The bid shall be submitted in a sealed envelope with all the original pages intact.; until such services are repaired or corrected, and accepted, by the Project Manager.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; itemize/detail components of proposed prices and/or invoices; i.; compressor, providing lighting as well electrical outlets throughout the structure.; Warranty shall be as noted or be greater.; permits shall be submitted to the Agency.; warranty for up to a one-year period following Notice of Completion.; banks by hand pudding (No mechanical vibration).; Permits issued by the jurisdictional regulatory agencies, if applicable.; Pipeline curves should show clear curve data which includes the BC, EC, and curve geometry.; 6075 Kimball Avenue, Building; 6075 Kimball Ave; Electrical Contractors.

Submission deadline

2019-03-12

Red flag teaser

10 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

10 found

Broad Indemnification

high

…----- 6 N. PREVAILING WAGE ---------------------------------------------------------------------------------------------------- 6 O. INDEMNIFICATION ---------------------------------------------------------------------------------------------------- 6 P. STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION --------------------------------- 7 Q. AWARD / SELECTION CRITERIA -------------------------

Liquidated Damages

high

…R. BID PRICE ----------------------------------------------------------------------------------------------------------------- 7 S. LIQUIDATED DAMAGES --------------------------------------------------------------------------------------------- 7 T. FORCE ACCOUNT WORK --------------------------------------------------------------------------------------------- 7 SECTION 3 - SCOPE OF WORK ........

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…ork. ENGINEERS ESTIMATE of PROBABLE COST = $146,000 for Steel Building $136,000 for Electrical Work C. PRE-BID and JOB-WALK MEETING: Mandatory PRE-BID MEETING and JOB-WALK: Tuesday, March 12, 2019 at 10:00 A.M. At Entry Scale Building 12645 6th Street Rancho Cucamonga, CA 91739 D. SUBMITTAL LOCATION, CLOSING DATE, AND TIME: Bids will not be accepted after the "closing" date and time indicated. Fa

Prevailing Wage / Certified Payroll

high

…----------------------------------------- 6 M. EQUAL EMPLOYMENT OPPORTUNITY AND HARASSMENT PROHIBITION ------------------------ 6 N. PREVAILING WAGE ---------------------------------------------------------------------------------------------------- 6 O. INDEMNIFICATION ---------------------------------------------------------------------------------------------------- 6 P. STANDARD SPECIFICATION

Bid Bond Required

medium

…icates within said time, his bid guarantee, if furnished, shall be returned to him within five (5) calendar days thereafter, and the bid bond, if furnished, shall become void. The bidder acknowledges and understands that a waiting period from time of bid opening until award may be ninety (90) calendar days during which bidder may not withdraw his bid. The bidder further acknowledges that he has a

Locked analysis

All deadlines table

1 dates
ItemDue
PRE-BID MEETING and JOB-WALK: Tuesday, 2019-03-12

Locked analysis

Required certifications checklist

23 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all