Demolish and Dispose of Structure at 1614 & 1632 N Blackstone Ave

Source scope cues include: City of Fresno is soliciting; City of Fresno; PREVAILING WAGE The work hereunder constitutes a “public work” as defined in the California Labor Code, Division 2, Part 7, Chapter 1 (; ASBESTOS SURVEY BLACKSTONE & MCKINLEY BNSF GRADE SEPARATION 1614/1632 NORTH BLACKSTONE AVENUE APN 446-232-40 / APN 446-232-36 FRESNO, CALIFORNIA Project No. 014-24149 December 1...; are required to attend the job site located at 1614 N.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; invoices submitted must contain all information and supporting documentation required by the contract.; in a Resolution setting forth facts constituting the emergency or necessity.; construction of a building, or renovation of, or addition to, an existing building.; additional insured for all ongoing and completed operations.; submittals are approved, and permits issued in order for the work to commence.; support for reimbursement payment vouchers or invoices sent to or paid by the City.; in the Labor Code for violation of prevailing wage rates.; invoices of the Mediator actually billed to Owner by Contractor.; otherwise in Specifications or required permits.; warranty costs, including the transportation costs to and from the repair station.; must invoice the City, in order to initiate the payment process.; The Contractor shall secure all permits required to complete the items of this Contract.; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; 2600 Fresno Street, Fresno. The.

BID WITH CAUTION 18 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Fresno is soliciting; City of Fresno; PREVAILING WAGE The work hereunder constitutes a “public work” as defined in the California Labor Code, Division 2, Part 7, Chapter 1 (; ASBESTOS SURVEY BLACKSTONE & MCKINLEY BNSF GRADE SEPARATION 1614/1632 NORTH BLACKSTONE AVENUE APN 446-232-40 / APN 446-232-36 FRESNO, CALIFORNIA Project No. 014-24149 December 1...; are required to attend the job site located at 1614 N.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; invoices submitted must contain all information and supporting documentation required by the contract.; in a Resolution setting forth facts constituting the emergency or necessity.; construction of a building, or renovation of, or addition to, an existing building.; additional insured for all ongoing and completed operations.; submittals are approved, and permits issued in order for the work to commence.; support for reimbursement payment vouchers or invoices sent to or paid by the City.; in the Labor Code for violation of prevailing wage rates.; invoices of the Mediator actually billed to Owner by Contractor.; otherwise in Specifications or required permits.; warranty costs, including the transportation costs to and from the repair station.; must invoice the City, in order to initiate the payment process.; The Contractor shall secure all permits required to complete the items of this Contract.; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; 2600 Fresno Street, Fresno. The.

Submission deadline

2025-08-25

Red flag teaser

18 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

18 found

Back-Charge / Setoff Rights

high

…or. As an alternative to payment of such claims or obligations, City, in its sole discretion, may reduce the total Contract price or set-off the amount against payments due. WAIVER AND RELEASE FORMS Consistent with the provisions of California Civil Code Chapter 3 – Waiver and Release [8120 – 8138], the Contractor and its subcontractors shall promptly furnish the City with a release of all claims

Broad Indemnification

high

…m the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker. If a Bidder refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be fin

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

…OSHA and California OSHA regulations should be followed. Furthermore, the United States Department of Housing and Urban Development (HUD) publication entitled "Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing," dated 1995, outlines specific guidelines for disrupting paint with lead in excess of 5,000 mg/kg (lead-based paint). These guidelines have been developed pr

Hazardous Material / Abatement Coordination

high

DIVISION VI ASBESTOS AND LEAD BASED PAINT SURVEY DOCUMENTS InformalNoFedConstruction 6.0 rev. 10.23

Lien Waiver / Waiver of Lien Rights

high

…he Contract Documents; or (iii) terms of special warranties required by the Contract Documents. Contractor shall promptly provide an unconditional waiver and release upon final payment in accordance with California Civil Code section 3262 and these Contract Documents. Except to the extent of any Claim arising from City’s sole or active negligence, and except to the extent Contractor expressly des

Locked analysis

All deadlines table

1 dates
ItemDue
A mandatory pre-bid conference will be held at 9:00 a.m., on 2025-08-25

Locked analysis

Required certifications checklist

21 items
  • Complete bid/proposal form
  • Include performance bond
  • Include payment bond
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Confirm mandatory pre-bid meeting or site visit attendance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all