← Public RFP analyses

Del Paso Blvd Infrastructure Needs

Source scope cues include: CITY OF SACRAMENTO SPECIAL PROVISIONS; City of Sacramento; 06 Proof of Compliance with Contract .; 32 Unsuitable Material, Removal, and Replacement .; documents or other satisfactory proofs as to his compliance with such requirements.; handling, storage, and repair of pipe and fittings shall be included.; Damage to other existing utilities.; within 50-feet of the tracks located on each side of the tracks.; adjacent pavement, structures, fences, walls, pipelines, and utilities.; gutter replacement shall coincide with sidewalk panel being replaced.; and to prevent settlement and damage to structures and utilities.; Permits shall be approved before discharge is allowed.; sealed as covered elsewhere in these Special Provisions.; gutters, driveways, fences, walls, structures, underground structures, landscaping, etc.; field locate and mark at the surface, existing utilities within the project area.; all utilities along the full pipeline alignment as directed by the Engineer.; sequence and will not damage nearby utilities, structures, or pavements.; This item shall include all work required to perform point repairs..

BID WITH CAUTION 2 red flags detected : Differing / Unknown Site Conditions (Contractor Risk)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF SACRAMENTO SPECIAL PROVISIONS; City of Sacramento; 06 Proof of Compliance with Contract .; 32 Unsuitable Material, Removal, and Replacement .; documents or other satisfactory proofs as to his compliance with such requirements.; handling, storage, and repair of pipe and fittings shall be included.; Damage to other existing utilities.; within 50-feet of the tracks located on each side of the tracks.; adjacent pavement, structures, fences, walls, pipelines, and utilities.; gutter replacement shall coincide with sidewalk panel being replaced.; and to prevent settlement and damage to structures and utilities.; Permits shall be approved before discharge is allowed.; sealed as covered elsewhere in these Special Provisions.; gutters, driveways, fences, walls, structures, underground structures, landscaping, etc.; field locate and mark at the surface, existing utilities within the project area.; all utilities along the full pipeline alignment as directed by the Engineer.; sequence and will not damage nearby utilities, structures, or pavements.; This item shall include all work required to perform point repairs..

Submission deadline

Not listed in the public preview.

Red flag teaser

2 red flags detected including Differing / Unknown Site Conditions (Contractor Risk).

Locked analysis

Full red flag list with excerpts

2 found

Differing / Unknown Site Conditions (Contractor Risk)

medium

…......22 2.06 Work Performed by City Crews ..................................................................................22 2.07 Existing Site Conditions .............................................................................................22 2.08 Handling and Removal of Hazardous or Contaminated Materials ...........................23 2.09 Health and Safety ...........................

Work Hours Restriction

medium

…ordination meetings throughout the duration of the construction work and shall anticipate 1 to 1-1/2 hours each meeting. Weekend and night work where approved by City will be performed in accordance with Section 7-4 of the Standard Specifications and shall comply with the noise ordinance in Chapter 8.68 of the Sacramento City Code. When change orders are initiated, delays are experienced, or the

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

3 items
  • Acknowledge all addenda
  • Include references or past project experience
  • Include safety documents if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all