Damaged Concrete Removal and Replacement at Fire Stations 7 and 8

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; planetbids.com/portal/portal; acting within the scope of their particular duties.; NOTE: The scope of work will take place in and around a fully operational Fire Station.; NO HARD COPY BIDS WILL BE ACCEPTED.; telephone number of an agent located in the State of California who is authorized to act for the bonding company.; 1) Permits from other agencies as may be required by law.; architect, proper agency or department in order to obtain approval and/or proper permits.; cost, permits and insurance required of the Contractor by other agencies and organizations.; or other forces, from the supplier thereof as evidenced by supplier's invoice.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; Material charges shall be substantiated by valid copies of vendors’ invoices.; utilities which will be required for this project.; to the Contractor's operations shall be repaired immediately and at the Contractor's expense.; above guarantee is offered without limitation to the cost of such repairs or replacement.; Superintendent shall be final in determining whether an operational emergency exists.; 3900 Main Street, Riverside, CA; 10191 Cypress Ave; 3900 Main Street.

BID WITH CAUTION 15 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; planetbids.com/portal/portal; acting within the scope of their particular duties.; NOTE: The scope of work will take place in and around a fully operational Fire Station.; NO HARD COPY BIDS WILL BE ACCEPTED.; telephone number of an agent located in the State of California who is authorized to act for the bonding company.; 1) Permits from other agencies as may be required by law.; architect, proper agency or department in order to obtain approval and/or proper permits.; cost, permits and insurance required of the Contractor by other agencies and organizations.; or other forces, from the supplier thereof as evidenced by supplier's invoice.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; Material charges shall be substantiated by valid copies of vendors’ invoices.; utilities which will be required for this project.; to the Contractor's operations shall be repaired immediately and at the Contractor's expense.; above guarantee is offered without limitation to the cost of such repairs or replacement.; Superintendent shall be final in determining whether an operational emergency exists.; 3900 Main Street, Riverside, CA; 10191 Cypress Ave; 3900 Main Street.

Submission deadline

2022-11-30

Red flag teaser

15 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

15 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…e in connection with this Work must be paid by the Contractor and the City is hereby relieved at all times from any indebtedness or claim other than payments under terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS SP-

Liquidated Damages

high

…ring the Project back on schedule within a reasonable period of time following such request will subject Contractor to assessment of liquidated damages at the daily rate specified for late completion. The Contractor shall not shorten or delete specified cure times or omit portions of the Work in order to bring the Project back within schedule unless such measures are mutually agreed to by the Pro

Mandatory Pre-Bid / Pre-Proposal Meeting

high

SECTION 2 --- SCOPE AND CONTROL OF THE WORK Tentative Schedule of Events Event Date Time Request for Bids Released 11/04/2022 N/A Mandatory Pre-Bid Meeting 11/17/2022 10:00 a.m. PST Final Questions Due 11/18/2022 Before 3:00 p.m. PST Responses to Questions Released 11/22/2022 N/A Bids Due 11/30/2022 Before 3:00 p.m. PST The City reserves the right to amend, withdraw and cancel this BID. The City r

Prevailing Wage / Certified Payroll

high

…patronage in the City, Contractor shall use its best efforts to purchase supplies within the City limits. 7-2.2 Laws. A schedule of prevailing wage rates as published by the California Department of Industrial Relations for the types of work to be done under these Special Provisions is on file in the office of the City Clerk, City Hall, 3900 Main Street, Riverside, which schedule is open for insp

Locked analysis

All deadlines table

5 dates
ItemDue
Bids are to be submitted no later than 2022-11-30
Request for Bids Released 2022-11-04
Mandatory Pre-Bid Meeting 2022-11-17
Final Questions Due 2022-11-18
Responses to Questions Released 2022-11-22

Locked analysis

Required certifications checklist

26 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all