Crane Services for Tree Removal

The City of Sacramento Department of Public Works, Maintenance Services Division, Urban Forestry Section seeks crane services for large tree removal projects on an as-needed basis throughout the city. The contractor must provide a 70-ton or larger crane, qualified operator, support crew, and all required tools and safety equipment. This is a non-professional services contract for public works maintenance, covering the period July 1, 2018 through June 30, 2019, with an optional one-year extension through June 30, 2020. The total contract value is capped at $95,000 for the anticipated two-year term. Source scope cues include: CITY OF SACRAMENTO Date and; CITY OF SACRAMENTO form shall; planetbids.com/portal/portal; If necessary, the burden of proof and cost of analysis to or replacement.; Sacramento taxes, permits, or fees.; located in the city or unincorporated county of Sacramento.; meets the minimum scope and limits of insurance coverage specified in subsection A, above.; for a public works project, using the online PWC-100 form.; PREVAILING WAGE, APPRENTICES, PENALTIES, & CERTIFIED PAYROLL..

BID WITH CAUTION 18 red flags detected : Apprentice Employment Requirements

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

The City of Sacramento Department of Public Works, Maintenance Services Division, Urban Forestry Section seeks crane services for large tree removal projects on an as-needed basis throughout the city. The contractor must provide a 70-ton or larger crane, qualified operator, support crew, and all required tools and safety equipment. This is a non-professional services contract for public works maintenance, covering the period July 1, 2018 through June 30, 2019, with an optional one-year extension through June 30, 2020. The total contract value is capped at $95,000 for the anticipated two-year term. Source scope cues include: CITY OF SACRAMENTO Date and; CITY OF SACRAMENTO form shall; planetbids.com/portal/portal; If necessary, the burden of proof and cost of analysis to or replacement.; Sacramento taxes, permits, or fees.; located in the city or unincorporated county of Sacramento.; meets the minimum scope and limits of insurance coverage specified in subsection A, above.; for a public works project, using the online PWC-100 form.; PREVAILING WAGE, APPRENTICES, PENALTIES, & CERTIFIED PAYROLL..

Submission deadline

2018-06-26

Red flag teaser

18 red flags detected including Apprentice Employment Requirements.

Locked analysis

Full red flag list with excerpts

18 found

Apprentice Employment Requirements

high

It is the duty of the contractor and subcontractors to employ registered apprentices and to comply with all aspects of Labor Code section 1777.5 (City Code 3.60.190). There are penalties required for contractor's/subcontractor's failure to pay prevailing wages and for failure to employ apprentices, including forfeitures and debarment under Labor Code sections 1775, 1776, 1777.1, 1777.7 and 1813.

Broad Indemnification

high

…ontract is for specialized legal services if in the best interest of the City. 9. In consideration of the foregoing, I shall defend, indemnify and hold harmless, the City, its officers and employees, against any claims, actions, damages, costs (including reasonable attorney fees), or other liabilities of any kind arising from any violation of the City’s Equal Benefits Requirements or of the Ordin

Contractor Responsible for Compliance with All Laws

high

Under Labor Code section 1776, contractors and subcontractors are required to keep accurate payroll records. The prime contractor is responsible for submittal of their payrolls and those of their subcontractors as one package. Payroll records shall be certified and made available for inspection at all reasonable hours at the principal office of the contractor/subcontractor, pursuant to Labor Code section 1776.

Equal Benefits Ordinance Compliance

high

The provisions of the Ordinance apply to any contract or agreement (as defined below), between a Contractor and the City of Sacramento, in an amount exceeding $100,000.00. I understand that failure to comply with the provisions of Section 5. (a) through (i), above, will subject me to possible suspension and/or termination of this Contract for cause; repayment of any or all of the Contract amount disbursed by the City; debarment for future contracts until all penalties and restitution have been paid in full; deemed ineligible for future contracts for up to two (2) years; the imposition of a penalty, payable to the City, in the sum of $50.00 for each employee, for each calendar day during which the employee was discriminated against.

Liability Not Limited by Insurance Coverage

high

It is understood and agreed by the CONTRACTOR that its liability to the CITY shall not in any way be limited to or affected by the amount of insurance coverage required or carried by the CONTRACTOR in connection with this Agreement.

Locked analysis

All deadlines table

3 dates
ItemDue
Bid Submission Deadline 2018-06-26
Contract Start Date 2018-07-01
Contract End Date (Year 1) 2019-06-30

Locked analysis

Required certifications checklist

20 items
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include references or past project experience
  • Confirm prevailing wage / certified payroll requirements
  • Verify requirement: Commercial General Liability Insurance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all