← Public RFP analyses

Construction Services for AWMP Package 6B - P19141311012

Source scope cues include: CONSTRUCTION SERVICES FOR ACCELERATED WATER METER PROGRAM PACKAGE 6B Project #s: Z14010093, B19141321007 Issued: February 14, 2019; City of Sacramento; City of Sacramento are metered; Prevailing Wages 19 5. Apprentices 19 6. Department of Industrial Relations (DIR) Contractor Registration 20 7. Tax Forms 20 8. Addenda; bond requirements of the Contractor. 4. The work performed or the materials/equipment/supplies provided by the listed LBE are unsatisfactory or are not in accordance with the pl...; Type 3 – Pipeline Replacement and New Metered Services (PR) Installations.; An electronic (PDF) shall be uploaded to PlanetBids no later than 3:00 PM, MARCH 21, 2019.; Sealed Proposals will be submitted to Planetbids, up to the hour of 3:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; The Sealed Proposal will be received not later than 3:00 P.; Z-14 Repair Sewer Service 0 EA $500.; promulgated by the City Department of Utilities.; Franchised hauler: Check the Department of Utilities (DOU) website for a list of these haulers.; employee located in the City or unincorporated county of Sacramento.; demand all costs and expense of such repair.; covered by policy terms or endorsement as additional insureds as respects auto liability.; insurance is canceled or Contractor otherwise ceases to be insured as required herein.; the minimum scope and limits of insurance coverage specified in subsection A, above.; 2812 Meadowview Road, Building; 80 MITZ ST; 80 DOOLITTLE ST.

BID WITH CAUTION 18 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CONSTRUCTION SERVICES FOR ACCELERATED WATER METER PROGRAM PACKAGE 6B Project #s: Z14010093, B19141321007 Issued: February 14, 2019; City of Sacramento; City of Sacramento are metered; Prevailing Wages 19 5. Apprentices 19 6. Department of Industrial Relations (DIR) Contractor Registration 20 7. Tax Forms 20 8. Addenda; bond requirements of the Contractor. 4. The work performed or the materials/equipment/supplies provided by the listed LBE are unsatisfactory or are not in accordance with the pl...; Type 3 – Pipeline Replacement and New Metered Services (PR) Installations.; An electronic (PDF) shall be uploaded to PlanetBids no later than 3:00 PM, MARCH 21, 2019.; Sealed Proposals will be submitted to Planetbids, up to the hour of 3:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; The Sealed Proposal will be received not later than 3:00 P.; Z-14 Repair Sewer Service 0 EA $500.; promulgated by the City Department of Utilities.; Franchised hauler: Check the Department of Utilities (DOU) website for a list of these haulers.; employee located in the City or unincorporated county of Sacramento.; demand all costs and expense of such repair.; covered by policy terms or endorsement as additional insureds as respects auto liability.; insurance is canceled or Contractor otherwise ceases to be insured as required herein.; the minimum scope and limits of insurance coverage specified in subsection A, above.; 2812 Meadowview Road, Building; 80 MITZ ST; 80 DOOLITTLE ST.

Submission deadline

2019-06-19

Red flag teaser

18 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

18 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, costs and expenses of every type and description, whether arisi

Guaranteed Maximum Price (GMP) / Hard Budget Cap

high

…established by California Bill AB1953 and ANSI/NFS Standard 61 Annex F and Annex G requirements. They shall be designed for use with potable water below 80 degrees F Registration Accuracy All Turbine Type Meters shall meet or exceed the AWWA latest standard, as follows: Size Normal Flow GMP 98.5% - 101.5% 1 1/2” 4-120 2” 4-190 3” 8-435 4” 15-750 6” 30-1,600 8” 50-2,800 10” 75-4,200 Section 3 3-20

Hazardous Material / Abatement Coordination

high

…o be performed at each end of the abandoned pipe, including intermediate connections, depending on the material of the water main: Asbestos-cement, ductile iron, PVC, and cast iron pipe and wrought iron pipe shall be plugged with two (2) feet of concrete. Steel pipe shall be abandoned by either welding 1/4-inch thick steel plate on cut ends or plugging with two (2) feet of concrete. In the

Liquidated Damages

high

…the RFP and Special Provisions commencing on the date specified in the Notice to Proceed. The Agreement describes the assessment of liquidated damages to be paid by the Contractor for failing to meet contractual dates for substantial and completion. The undersigned represents and warrants that he/she has examined the location of the proposed work and is familiar with the conditions at the place w

Locked analysis

All deadlines table

5 dates
ItemDue
Notice To Proceed 2019-06-19
Project Completion 2019-10-03
Project Award 2017-04-03
Final day for Proposers to Submit Questions 2019-03-07
Proposals Due (by 3:00 p.m.) 2019-03-21

Locked analysis

Required certifications checklist

22 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all