Back-Charge / Setoff Rights
high…Since float time within the Construction Schedule is jointly owned, it is acknowledged that IEUA caused delays on the project may be offset by IEUA caused time savings (e.g. critical path submittals returned in less time than allowed by the Contract or approval of substitution requests which result in a savings of time to the CONTRACTOR). In such an event, the CONTRACTOR shall not be entitled to