← Public RFP analyses

Colorado River Aqueduct Pumping Plants - Sump Rehabilitation

Source scope cues include: Bearing and lubrication system design data.; 01730, Operations and Maintenance Data.; section, shall be in accordance with Section 01740, Guarantee and Warranty.; under any condition of mechanical or hydraulic loading.; Specific motor data such as HP, RPM, enclosure type, etc.; mechanical equipment with which the motor is supplied.; proof motors, unless specified differently under the detailed mechanical specifications, or as shown on the drawings.; Motors shall be provided with sealed ball bearings lubricated for 10 years continuous use.; volt, 3 phase, 60 hertz alternating current system as specified on the equipment datasheet.; premium grade, resistant to attack by moisture, acids, alkalies and mechanical or thermal shock.; Motor leads shall be sealed with a non-wicking, non-hygroscopic insulating material.; Capacitors shall be dry film or liquid insulated and shall be hermetically sealed in steel enclosures.; Drawings or where called for in the detailed mechanical specifications for individual equipment.; Proof of design documentation shall be made available to Metropolitan upon request.; invoices, bills of lading, and shipping lists on all articles and materials for use on the work.; removed from service for replacement or correction of defects.; Houston; Mechanical Contractors; Electrical Contractors.

BID WITH CAUTION 7 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Bearing and lubrication system design data.; 01730, Operations and Maintenance Data.; section, shall be in accordance with Section 01740, Guarantee and Warranty.; under any condition of mechanical or hydraulic loading.; Specific motor data such as HP, RPM, enclosure type, etc.; mechanical equipment with which the motor is supplied.; proof motors, unless specified differently under the detailed mechanical specifications, or as shown on the drawings.; Motors shall be provided with sealed ball bearings lubricated for 10 years continuous use.; volt, 3 phase, 60 hertz alternating current system as specified on the equipment datasheet.; premium grade, resistant to attack by moisture, acids, alkalies and mechanical or thermal shock.; Motor leads shall be sealed with a non-wicking, non-hygroscopic insulating material.; Capacitors shall be dry film or liquid insulated and shall be hermetically sealed in steel enclosures.; Drawings or where called for in the detailed mechanical specifications for individual equipment.; Proof of design documentation shall be made available to Metropolitan upon request.; invoices, bills of lading, and shipping lists on all articles and materials for use on the work.; removed from service for replacement or correction of defects.; Houston; Mechanical Contractors; Electrical Contractors.

Submission deadline

Not listed in the public preview.

Red flag teaser

7 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

7 found

Hazardous Material / Abatement Coordination

high

…or Material 60. Differing or Unusual Site Conditions 27. Right of Property in Materials 61. Hazardous Substance, Hazardous Waste, or Asbestos- 28. Title to Materials Found on the Work Related Work 29. Access to Work 62. Hazardous Material 30. Liquidated Damages 63. Hazardous Waste 31. Patents and Copyrights 64. Insurance 32. No Payment for Temporary or Preliminary Works 65. Payrolls and Records 3

Liquidated Damages

high

…e, Hazardous Waste, or Asbestos- 28. Title to Materials Found on the Work Related Work 29. Access to Work 62. Hazardous Material 30. Liquidated Damages 63. Hazardous Waste 31. Patents and Copyrights 64. Insurance 32. No Payment for Temporary or Preliminary Works 65. Payrolls and Records 33. Partial Estimates 66. Non-Use of Intellectual Property of Third Parties 34. Partial Estimates May Be Withhe

Background Check / Drug Testing Requirement

medium

…Trespass 15. Right-of-Way 50. Character of Workers 16. Obligations of Contractor 51. Employment of Labor 17. Personal Attention 52. Substance Abuse Policy 18. Protest and Claims Procedure 53. Safety and Protection 19. Contractor's Responsibilities for Losses or Liabilities 54. Laws and Regulations 20. Contractor to Furnish Information 55. Employment of Indentured Apprentices 21. (Not used) 56. Su

Payment Bond Required

medium

…on to be Executed by Bidder CONTRACT ADMINISTRATION FORMS 00505 — Agreement 00520 — Escrow Agreement for Security Deposits In Lieu of Retention 00610 — Bond for Faithful Performance 00620 — Payment Bond 00660 — Workers' Compensation Insurance Certification CONDITIONS OF THE CONTRACT 00700 — General Conditions 00800 — Supplementary General Conditions MS May 21, 2018 -1- 1874 (construction contract

Right to Audit Books/Records

medium

…f the Engineer 43. Payment of Wages 10. Changes 44. Eight-hour Law 11. Extra Work 45. Overtime — No Extra Compensation 12. Audit and Access to Records 46. Prevailing Rates of Wages 13. Temporary Suspension of Work—Time of 47. Interference with Fire Hydrants and Highways Completion 48. Other Rights-of-Way and Structures 14. Termination of Contract for Convenience 49. Trespass 15. Right-of-Way 50.

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

8 items
  • Include payment bond
  • Verify workers compensation coverage
  • Include references or past project experience
  • Include subcontractor list if required
  • Include safety documents if required
  • Verify requirement: Workers Compensation Insurance
  • Resolve before bid: Liquidated Damages
  • Resolve before bid: Payment Bond Required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all