Colorado River Aqueduct Overhead Crane Replacement

Source scope cues include: City of Los Angeles; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; proper invoices, bills of lading, etc.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; less than the prevailing wage rate shall be paid to each worker by the Contractor.; utilities, and underground facilities not designated for removal, relocation, or replacement in the course of construction.; all licenses, permits, inspections, and approvals required by the use of such hazardous materials.; state-licensed hauler and state-licensed treatment, storage, and disposal facility, as required by state and federal regulations.; insureds with respect to the project covered by the Contract, during the period of the Contract.; Houston; Electrical Contractors; plumbing contractor.

BID WITH CAUTION 18 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; proper invoices, bills of lading, etc.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; less than the prevailing wage rate shall be paid to each worker by the Contractor.; utilities, and underground facilities not designated for removal, relocation, or replacement in the course of construction.; all licenses, permits, inspections, and approvals required by the use of such hazardous materials.; state-licensed hauler and state-licensed treatment, storage, and disposal facility, as required by state and federal regulations.; insureds with respect to the project covered by the Contract, during the period of the Contract.; Houston; Electrical Contractors; plumbing contractor.

Submission deadline

2020-06-10

Red flag teaser

18 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

18 found

Broad Indemnification

high

…from all claims of any kind arising directly or indirectly out of the performance of the work. (f) Indemnity. — The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind which may arise from or in connection with the performance of the work and the results of tha

Hazardous Material / Abatement Coordination

high

…Action 24. Inspection 60. Differing or Unusual Site Conditions 25. Examination of Work 61. Hazardous Substance, Hazardous Waste, or Asbestos- 26. Defective Work or Material Related Work 27. Right of Property in Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents a

Liquidated Damages

high

…n Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents and Copyrights 66. Non-Use of Intellectual Property of Third Parties 32. No Payment for Temporary or Preliminary Works 67. Prohibited Relationships with Sanctioned Countries 33. Partial Estimates and Persons 34

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…ork. Neither the bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimated cost range. N-5 A mandatory pre-bid conference will be held with responsible representatives of prospective bidders at the Gene Pumping Plant, 158000 MWD Ranch Rd. Parker Dam, CA 92267 at 9:30 a.m., June 10, 2020. Attendance at the pre-bid conference is a condition precedent to submi

Prevailing Wage / Certified Payroll

high

…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records it is requ

Locked analysis

All deadlines table

2 dates
ItemDue
Pumping Plant, 158000 MWD Ranch Rd. Parker Dam, CA 92267 at 9:30 a.m., 2020-06-10
Instructions to Bidders, on or before 2:00 p.m., 2020-07-02

Locked analysis

Required certifications checklist

25 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all