Broad Indemnification
high
General Conditions (f) Indemnity. — The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind which may arise from or in connection with the performance of the work and the results of that work by the Contractor, its agents, representatives, employees, or subcontr
Hazardous Material / Abatement Coordination
high
…or Material 60. Differing or Unusual Site Conditions 27. Right of Property in Materials 61. Hazardous Substance, Hazardous Waste, or Asbestos- 28. Title to Materials Found on the Work Related Work 29. Access to Work 62. Hazardous Material 30. Liquidated Damages 63. Hazardous Waste 31. Patents and Copyrights 64. Insurance 32. No Payment for Temporary or Preliminary Works 65. Payrolls and Records 3
Liquidated Damages
high
…e, Hazardous Waste, or Asbestos- 28. Title to Materials Found on the Work Related Work 29. Access to Work 62. Hazardous Material 30. Liquidated Damages 63. Hazardous Waste 31. Patents and Copyrights 64. Insurance 32. No Payment for Temporary or Preliminary Works 65. Payrolls and Records 33. Partial Estimates 66. Non-Use of Intellectual Property of Third Parties 34. Partial Estimates May Be Withhe
Prevailing Wage / Certified Payroll
high
…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records it is requ
Project Labor Agreement / Union Requirements
high
…but not limited to, compensation insurance, and social security payments. (3) The amount paid for subsistence and travel required by collective bargaining agreements, or in accordance with the regular practice of the employer. At the beginning of the Contract and as later requested by the Engineer, the Contractor shall furnish the Engineer proof of labor compensation rates being paid or paid. (e)