← Public RFP analyses

Coating Inspection, Corrosion Testing, and Assessment Services for Collection System and Treatment Plants

Source scope cues include: RFP-RW-21-002 For Provision Of Coating Inspection, Corrosion Testing, and Assessment Services for Collection System and Treatment Plants; City of Ontario; City of Chino; PREVAILING WAGE 2-1 C. INSURANCE 2-1 D. PROPOSAL PREPARATION COSTS 2-1 E. PROPOSAL INCLUSIONS 2-1 F. WITHDRAWAL OF PROPOSAL BEFORE DUE; PlanetBids Online Question and Answer (Q&A) section. Responses to questions will not be made individually but will be released as an Addendum after the Q&A period closes. D. PRO...; PROPOSAL LABELING: Proposals shall be submitted electronically via PlanetBids.; PlanetBids System and received not later than the scheduled closing time.; PREVAILING WAGES: Not applicable to this project.; 1 (RP-1), located in the City of Ontario; Regional Water Recycling Plant No.; 2), located in the City of Chino; Regional Water Recycling Plant No.; issued by the city where Offeror's principal place of business is located.; the Inland Empire Utilities Agency, its officers, employees, agents, representatives, and volunteers.; linings experience licensed in the State of California on their staff.; include a statement acknowledging the scope of work.; harnesses and ropes to carry out the required support work scope).; standard or published reference shall be listed in the test data table.; Data shall be provided both in both tabular and graphical form.; all confined-space entrants and for emergency rescue crews shall be provided.; be in accordance with pre-approved project-specific cost estimates.; 6075 Kimball Avenue, Building.

BID WITH CAUTION 11 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: RFP-RW-21-002 For Provision Of Coating Inspection, Corrosion Testing, and Assessment Services for Collection System and Treatment Plants; City of Ontario; City of Chino; PREVAILING WAGE 2-1 C. INSURANCE 2-1 D. PROPOSAL PREPARATION COSTS 2-1 E. PROPOSAL INCLUSIONS 2-1 F. WITHDRAWAL OF PROPOSAL BEFORE DUE; PlanetBids Online Question and Answer (Q&A) section. Responses to questions will not be made individually but will be released as an Addendum after the Q&A period closes. D. PRO...; PROPOSAL LABELING: Proposals shall be submitted electronically via PlanetBids.; PlanetBids System and received not later than the scheduled closing time.; PREVAILING WAGES: Not applicable to this project.; 1 (RP-1), located in the City of Ontario; Regional Water Recycling Plant No.; 2), located in the City of Chino; Regional Water Recycling Plant No.; issued by the city where Offeror's principal place of business is located.; the Inland Empire Utilities Agency, its officers, employees, agents, representatives, and volunteers.; linings experience licensed in the State of California on their staff.; include a statement acknowledging the scope of work.; harnesses and ropes to carry out the required support work scope).; standard or published reference shall be listed in the test data table.; Data shall be provided both in both tabular and graphical form.; all confined-space entrants and for emergency rescue crews shall be provided.; be in accordance with pre-approved project-specific cost estimates.; 6075 Kimball Avenue, Building.

Submission deadline

2021-04-19

Red flag teaser

11 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

11 found

Broad Indemnification

high

…, for any of the contents of an Offeror’s proposal marked “TRADE SECRET,” “CONFIDENTIAL,” or “PROPRIETARY,” Offeror shall defend and indemnify Agency from any and all liability, damages, costs, and expense, including attorneys’ fee, in any action or proceeding arising under the California Public Records Act. M. BACKGROUND: The Agency is a regional wastewater treatment agency that provides sewage

Liquidated Damages

high

…ther responsible for the effects of acts occurring beyond their control; e.g., war, riots, strikes, natural disasters, etcetera. 21. LIQUIDATED DAMAGES: Liquidated Damages shall not be imposed via this Contract. 22. CHANGES: The Agency may, at any time, make changes to this Contract’s Scope of Work; including additions, reductions and other alterations to any or all of the work. However, such cha

Prevailing Wage / Certified Payroll

high

…IME 1-1 C. INQUIRIES 1-1 D. PROPOSAL LABELING 1-1 E. PROPOSAL SUBMITTAL 1-1 SECTION 2 - GENERAL INFORMATION A. WAITING PERIOD 2-1 B. PREVAILING WAGE 2-1 C. INSURANCE 2-1 D. PROPOSAL PREPARATION COSTS 2-1 E. PROPOSAL INCLUSIONS 2-1 F. WITHDRAWAL OF PROPOSAL BEFORE DUE DATE 2-1 G. MISTAKE IN PROPOSAL 2-1 H. PROPOSAL ACCEPTANCE 2-2 I. INTERPRETATION OF DOCUMENTS 2-2 J. CONTRACTOR REFERENCES 2-2 K. C

Project Labor Agreement / Union Requirements

high

…payments which are needed to execute the work and/or service, as such travel and subsistence payments are defined in the applicable collective bargaining agreements with the worker. H. Liens: Contractor shall pay all sums of money that become due from any labor, services, materials or equipment furnished to Contractor on account of said services to be rendered or said materials to be furnished un

High Insurance Limits Required

medium

…cluding products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. a. The insurance

Locked analysis

All deadlines table

2 dates
ItemDue
Release 2021-04-19
Closing 2021-05-19

Locked analysis

Required certifications checklist

16 items
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include W-9 or taxpayer information
  • Include references or past project experience
  • Include safety documents if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all