Citywide Pedestrian Crossing Improvements

Source scope cues include: City of Riverside March; City of Riverside; project consists of constructing flashing LED stop signs, retrofitting concrete curb ramps, and installing high visibility crosswalks at 14 locations within the City. The locati...; planetbids.com/portal/portal; Section 2 – Scope And Control Of The Work .; Riverside Public Utilities Water Division Specification No.; be submitted via “Q&A” through the City’s Electronic Bidding System, PlanetBids Vendor Portal.; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; Contractor must use an Additional Insured Endorsement approved by the City.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; liquidatable incidents per working day.; Control Plan" that has been prepared by either a licensed Traffic or Civil Engineer.; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, which schedule; 8095 Lincoln Avenue.

BID WITH CAUTION 14 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside March; City of Riverside; project consists of constructing flashing LED stop signs, retrofitting concrete curb ramps, and installing high visibility crosswalks at 14 locations within the City. The locati...; planetbids.com/portal/portal; Section 2 – Scope And Control Of The Work .; Riverside Public Utilities Water Division Specification No.; be submitted via “Q&A” through the City’s Electronic Bidding System, PlanetBids Vendor Portal.; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; Contractor must use an Additional Insured Endorsement approved by the City.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; liquidatable incidents per working day.; Control Plan" that has been prepared by either a licensed Traffic or Civil Engineer.; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, which schedule; 8095 Lincoln Avenue.

Submission deadline

2023-03-29

Red flag teaser

14 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

14 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…is hereby relieved at all times from any indebtedness or claim other than payments under terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS 2-3.2 Self Performance. The Contractor shall perform, with its own organizatio

Liquidated Damages

high

…ty to accommodate another contract, even with the City. For each incident the Contractor does not submit an updated weekly schedule, liquidated damages will be assessed as described in Section 6-9 of these Special Provisions. The Contractor’s construction schedule shall be submitted at the Pre-Construction Conference. Upon review of the Contractor's construction schedule by the Engineer, a "Notic

No Material Substitutions Without Owner Approval

high

…Specifications. 201-1 PORTLAND CEMENT CONCRETE 201-1.2.1 Portland Cement. Portland Cement for CSPB shall be Type II or V. There are no substitutions for Portland Cement. 203-6 ASPHALT CONCRETE Where dense graded asphalt is being constructed in two layers or more, the Asphalt Concrete pavement for the base course shall be B-PG 70-10. When dense graded asphalt is being constructed in a single layer

Prevailing Wage / Certified Payroll

high

…will also comply with the following sections of the California Labor Code: a. Section 1775 prescribing sanctions for failure to pay prevailing wage rates; b. Section 1776 requiring the making, keeping and disclosing of detailed payroll records and prescribing sanctions for failure to do so; c. Section 1777.5 prescribing the terms and conditions for employing registered apprentices; d. Section 181

Locked analysis

All deadlines table

2 dates
ItemDue
Bid 7990 – Special Provisions (Rev 2020-10-16) Part 1, Page 3 2023-03-29
Bid 7990 - Part 10 Part 10 Index 2023-03-06

Locked analysis

Required certifications checklist

22 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all