Central Avenue Slope Repair_ Rebid

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Utilities; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; matters within the Scope of the protest provisions in Section 6-3.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; and/or relocated shall be measured, marked, and identified in the field.; Landfill, located at the end of Rubidoux Avenue, Riverside, California.; Replacement of Unsuitable Material line item.; operations except that the minimum size replacement will be a No.; necessary surfaces repairs as required to complete the work.; Water Quality Control Plant located at 5950 Acorn Street.; 8235 Central Avenue; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA.

BID WITH CAUTION 16 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Utilities; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; matters within the Scope of the protest provisions in Section 6-3.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; and/or relocated shall be measured, marked, and identified in the field.; Landfill, located at the end of Rubidoux Avenue, Riverside, California.; Replacement of Unsuitable Material line item.; operations except that the minimum size replacement will be a No.; necessary surfaces repairs as required to complete the work.; Water Quality Control Plant located at 5950 Acorn Street.; 8235 Central Avenue; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA.

Submission deadline

2026-02-23

Red flag teaser

16 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

16 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…e paid by the Contractor and the City is hereby relieved at all times from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. Bid 8235 - Special Provisions Part 1, Page 9 2/17/202

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

…ne "X". The Zone “X” is designated as an area of minimal flood hazard and as an area with 0.2 percent annual chance of flood hazard (FEMA 2008). 6.0 SEISMICITY 6.1 Seismic Design Parameters Seismic parameters based on the 2022 California Building Code (CBSC, 2022) and ASCE 7-16 are provided in the following table. These parameters were determined using a coordinate (33.9561N and 117.343806W) and

HIPAA / Healthcare Data Privacy Compliance

high

…airs in areas steeper than a gradient greater than a 2:1 (horizontal to vertical), should also have a shear strength with at least a phi angle of 30 degrees and a cohesion of 250 psf, based on surficial stability calculations. Any imported fills should be tested and approved by the geotechnical representative at least 72 hours prior to delivery to the site. Any imported fills should also meet the

Liquidated Damages

high

…stored in public streets and right-of-way. If the Contractor does not adhere to this requirement, the Contractor shall be subject to Liquidated Damages as described in Section 6-9 of these Special Provisions. Excavated material, except that which is to be used as backfill in the adjacent trench, shall not be stored in public streets and right-of-way unless otherwise specified in these Special pro

Locked analysis

All deadlines table

3 dates
ItemDue
Online Questions Deadline 2026-02-23
Online Questions Responses 2026-02-25
Bid Due 2026-03-04

Locked analysis

Required certifications checklist

24 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all