← Public RFP analyses

Carbon Creek Pressure Control Structure - PCB Abatement

Source scope cues include: bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; PlanetBids. To log onto to go to PlanetBids: http://www.planetbids.com/portal/portal; sealed proposal; coordinate with separate PCB abatement work; Contract documents on this project are available on Metropolitan's on-line bid system called PlanetBids.; agents; the breach of any warranty, whether express or goods, services, or materials pursuant to the Contract.; Carbon Creek Pressure Control Structure, located at 2999 East La Jolla, Placentia, CA 92870.; The Contractor shall obtain all required permits from city and other government agencies.; The gaps between the lids are currently sealed with a mastic material to prevent water leakage to the basement.; Prepare the lids for off-site shipping as PCB containing hazardous waste.; Allow Metropolitan to perform confirmation testing to assure all of the PCB material is removed.; Remove additional concrete if confirmation testing indicates PCB-contaminated material remains.; Repeat steps 7 and 8 until all PCB contaminated material has been removed as directed by the Engineer.; Part of the work for this project consists of erecting and working on scaffolds.; requirements and entry permits as required with the Engineer prior to start of work.; Biphenyls (PCB) above regulatory levels.; 75 Hawthorne Street.

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; PlanetBids. To log onto to go to PlanetBids: http://www.planetbids.com/portal/portal; sealed proposal; coordinate with separate PCB abatement work; Contract documents on this project are available on Metropolitan's on-line bid system called PlanetBids.; agents; the breach of any warranty, whether express or goods, services, or materials pursuant to the Contract.; Carbon Creek Pressure Control Structure, located at 2999 East La Jolla, Placentia, CA 92870.; The Contractor shall obtain all required permits from city and other government agencies.; The gaps between the lids are currently sealed with a mastic material to prevent water leakage to the basement.; Prepare the lids for off-site shipping as PCB containing hazardous waste.; Allow Metropolitan to perform confirmation testing to assure all of the PCB material is removed.; Remove additional concrete if confirmation testing indicates PCB-contaminated material remains.; Repeat steps 7 and 8 until all PCB contaminated material has been removed as directed by the Engineer.; Part of the work for this project consists of erecting and working on scaffolds.; requirements and entry permits as required with the Engineer prior to start of work.; Biphenyls (PCB) above regulatory levels.; 75 Hawthorne Street.

Submission deadline

2018-11-28

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

General Conditions accompanied by the documents enumerated in California (b) Said duty to defend, indemnify and save harmless Code of Civil Procedure section 995.660. The bonds shall shall not be affected by the fact that Metropolitan, the be submitted in the form of “Bond for Faithful Board, any members of the Board, or Metropolitan's Performance” and “Payment Bond,” furnished by officers, agents

Hazardous Material / Abatement Coordination

high

THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA NOTICE INVITING BIDS FOR Carbon Creek Pressure Control Structure – PCB Abatement SPECIFICATIONS NO. M-3005 The Metropolitan Water District of Southern California hereby invites sealed bids for Carbon Creek Pressure Control Structure – PCB Abatement at the Carbon Creek Pressure Control Structure, located at 2999 East La Jolla, Placentia CA 9287

Liquidated Damages

high

…d shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies with the foregoing requirements in a timely manner, its cash deposit, certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bi

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…attendees shall sign-in with the Metropolitan representative until escorted to the project site. Contractors planning to attend the mandatory pre-bid meeting are encouraged to register on Metropolitan's on-line bid system, and download and print the bid documents and bring them to the pre-bid meeting. All prospective bidders bidding on this work shall have a valid California contractor’s license,

Prevailing Wage / Certified Payroll

high

…nd comply with all state jobsite. The Contractor shall pay not less than such and national laws, county and municipal ordinances and prevailing wages to all workers employed on public work regulations and orders of public bodies that in any manner unless the project involves a total consideration of one affect those engaged or employed in the work, or the thousand dollars ($1,000.00) or less. The

Locked analysis

All deadlines table

1 dates
ItemDue
inspection scheduled for 10:00 a.m., 2018-11-28

Locked analysis

Required certifications checklist

21 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all