C0715 Calabazas Creek Erosion Repair Project - Miller Avenue to Bollinger Road

Source scope cues include: City of Cupertino; City of Sunnyvale are considered; Cupertino General Plan Policies Related to Utilities .; CDFW, RWQCB, and United States Army Corps of Engineers (USACE) were in attendance.; repaired bank erosion at four locations in the current Project area.; of the bank repairs are included in Appendix A.; The staging area would be located on the edge of the existing athletic fields.; Following site preparation, work crews would begin repair of the 10 erosional features.; Location Proposed Repair (LF)a Area(ft2)a (CY) Fill (CY) No.; Maintenance repairs could address subsequent erosion at the site or riprap dislocation.; Ensure Proper equipment stationed in these locations is not readily relocated (i.; to prevent or repair leaks, prior to use.; mile length of channel in the Project area or be applied at the 10 erosion repair sites only.; the Project area is located in Cupertino and spans 0.; channel and bank repairs would only minimally alter existing grades.; by Government Code Section 51104(g) is located in the Project area.; the Project area, the Kaiser Permanente Hospital located 0.; , fence repair, minor riprap corrections, plant maintenance).; 10800 Torre Avenue.

BID WITH CAUTION 5 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Cupertino; City of Sunnyvale are considered; Cupertino General Plan Policies Related to Utilities .; CDFW, RWQCB, and United States Army Corps of Engineers (USACE) were in attendance.; repaired bank erosion at four locations in the current Project area.; of the bank repairs are included in Appendix A.; The staging area would be located on the edge of the existing athletic fields.; Following site preparation, work crews would begin repair of the 10 erosional features.; Location Proposed Repair (LF)a Area(ft2)a (CY) Fill (CY) No.; Maintenance repairs could address subsequent erosion at the site or riprap dislocation.; Ensure Proper equipment stationed in these locations is not readily relocated (i.; to prevent or repair leaks, prior to use.; mile length of channel in the Project area or be applied at the 10 erosion repair sites only.; the Project area is located in Cupertino and spans 0.; channel and bank repairs would only minimally alter existing grades.; by Government Code Section 51104(g) is located in the Project area.; the Project area, the Kaiser Permanente Hospital located 0.; , fence repair, minor riprap corrections, plant maintenance).; 10800 Torre Avenue.

Submission deadline

2019-07-15

Red flag teaser

5 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

5 found

Back-Charge / Setoff Rights

high

…ite 9 and the Project’s restoration effort to plant trees or vegetation) planted as part of the Project’s restoration may be used to offset the amount of mitigation required under this mitigation measure. In addition, any trees replaced pursuant to the City of Cupertino Protected Trees Ordinance (see Mitigation Measure BIO-5) could be counted towards the riparian mitigation. The HMMP will include

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

…Substances Control DU/acre dwelling units per acre EIR Environmental Impact Report EPA United States Environmental Protection Agency FEMA Federal Emergency Management Agency FESA Federal Endangered Species Act F&G Code California Fish and Game Code FMMP Farmland Mapping and Monitoring Program GHG Greenhouse Gas HCP Habitat Conservation Plan HMMP Habitat Mitigation and Monitoring Plan L Equivalent

Hazardous Material / Abatement Coordination

high

…n activities are enforced by Cal/OSHA. Regulations include requirements for protective clothing, training, and limits on exposure to hazardous materials. Cal/OSHA also enforces occupational health and safety regulations specific to lead and asbestos investigation and abatement: these regulations equal or exceed their federal counterparts. Specific worker safety measures for excavation hazards (e.

Occupied Building Constraints

medium

…Furthermore, this heavy equipment would generally be used in the bottom of the channel or mid-bank, and the distances to the nearest occupied buildings would typically be 50 feet or greater. At Sites 1 and 2, a jackhammer may be used for a brief period at approximately 25 to 45 feet from the nearest structures, but this activity is not expected to result in excessive ground borne vibration that s

Performance Bond Required

medium

…e extent and timing of hillside grading operations to April through Grading October except as otherwise allowed by the City. Require performance bonds during the remaining time to guarantee the repair of any erosion damage. Require planting of graded slopes as soon as practical after grading is complete. Source: City of Cupertino 2015a Existing Conditions Hazardous Materials The Project area is l

Locked analysis

All deadlines table

2 dates
ItemDue
Valley Water hosted an interagency site visit on 2019-07-15
was also placed with Chairwoman Nijmeh on 2019-08-19

Locked analysis

Required certifications checklist

5 items
  • Include references or past project experience
  • Include safety documents if required
  • Verify requirement: Performance Bond
  • Track deadline: Valley Water hosted an interagency site visit on
  • Resolve before bid: Performance Bond Required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all