C0714 - Almaden Valley Pipeline Replacement Project - Phase 1

Source scope cues include: City of San Jose Encroachment; City of San Jose District; Coordination With Utilities. 4. Emergency work as provided in Article 4.10. Preservation of Property and in the Special Provisions. 5. Protested Work under Article 3.11.01. Prot...; Scope and Schedule for Final Cleaning .; Contractor-Obtained Permits and Regulatory Deliverables.; time in the event that an emergency occurs.; Emergency work as provided in Article 4.; furnish cost data, which might assist the Engineer in establishing the rental rate.; copies of vendor invoices shall substantiate Material charges.; limitation onsite personnel and onsite office utilities.; should be separated into sub-items to present a detailed cost estimate.; based on invoices priced without markup.; the California Prevailing Wage Law, California Labor Code Section 1720, et seq.; the event there are adjustments to the General Prevailing Wage Rates.; Subcontractor in violation of the provisions of the Prevailing Wage Law.; Contractor in accordance with the Prevailing Wage Law.; hydrants until permits have been obtained thereof from the proper authorities.; performance of that part of the Work until the necessary repair has been made.; Water Treatment Plant; 18300 Peet Road, Morgan Hill, California.

BID WITH CAUTION 23 red flags detected : Pay-If-Paid Clause

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of San Jose Encroachment; City of San Jose District; Coordination With Utilities. 4. Emergency work as provided in Article 4.10. Preservation of Property and in the Special Provisions. 5. Protested Work under Article 3.11.01. Prot...; Scope and Schedule for Final Cleaning .; Contractor-Obtained Permits and Regulatory Deliverables.; time in the event that an emergency occurs.; Emergency work as provided in Article 4.; furnish cost data, which might assist the Engineer in establishing the rental rate.; copies of vendor invoices shall substantiate Material charges.; limitation onsite personnel and onsite office utilities.; should be separated into sub-items to present a detailed cost estimate.; based on invoices priced without markup.; the California Prevailing Wage Law, California Labor Code Section 1720, et seq.; the event there are adjustments to the General Prevailing Wage Rates.; Subcontractor in violation of the provisions of the Prevailing Wage Law.; Contractor in accordance with the Prevailing Wage Law.; hydrants until permits have been obtained thereof from the proper authorities.; performance of that part of the Work until the necessary repair has been made.; Water Treatment Plant; 18300 Peet Road, Morgan Hill, California.

Submission deadline

Not listed in the public preview.

Red flag teaser

23 red flags detected including Pay-If-Paid Clause.

Locked analysis

Full red flag list with excerpts

23 found

Pay-If-Paid Clause

critical

…ity to incorporate all necessary activities to cover the entire Work scope. 12. A favorably reviewed Baseline Progress Schedule is a condition precedent to payment. B. Cost Loading 1. Work activities other than third-party and District-managed activities shall be cost loaded. No activity shall have a value greater than $50,000 except for activities representing major Equipment purchases or instal

Broad Indemnification

high

…........................4-6 4.11. Contractor’s Responsibility for the Work.................................................4-7 4.12. Indemnification........................................................................................4-7 4.12.01. Indemnify and Hold Harmless.................................................................4-7 4.12.02. Limitation on Indemnity......................

Certified Small Business Set-Aside / Local Business Eligibility

high

…ncies. Responsible Bidder: Responsible Bidder as defined in California Public Contract Code Section 1103. Small Business Enterprise (SBE): A business that is currently certified by the State of California, Department of General Services as a small business. Specifications: The directions, provisions, and requirements contained in the Standard Provisions, Special Provisions, and Technical Provisio

Hazardous Material / Abatement Coordination

high

4.25. Utilities..................................................................................................4-11 4.26. Asbestos-Related Work........................................................................4-14 SECTION 5. PROSECUTION AND PROGRESS OF WORK.....................................5-1 5.01. Assignment..............................................................................

Liquidated Damages

high

…........................5-9 5.07. Temporary Suspension of Work.............................................................5-9 5.08. Liquidated Damages.............................................................................5-10 SECTION 6. MEASUREMENT AND PAYMENT.........................................................6-1 6.01. Schedule of Values...............................................

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

25 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all