C0673 - Santa Clara Conduit Rehabilitation and Pacheco Sectionalizing Valve Replacement Project

Source scope cues include: City of Gilroy; PlanetBids (PB System™) as indicated in Section 2. Santa Clara Valley Water District Vendor Portal; Prepare, coat and waterproof at identified interior vault walls.; properly licensed to perform its scope of Work.; Prevailing Wages, through Article 4.; Sectionalizing Valve Replacement Project.; Building located at 5750 Almaden Expressway, San Jose, CA 95118.; “Bid/Submittal Drop Box,” located in front of the entrance door.; third-party contractor to complete internal inspections and repairs.; permits operation and maintenance of the pipelines and tunnels.; Houston.

BID WITH CAUTION 4 red flags detected : Liquidated Damages

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Gilroy; PlanetBids (PB System™) as indicated in Section 2. Santa Clara Valley Water District Vendor Portal; Prepare, coat and waterproof at identified interior vault walls.; properly licensed to perform its scope of Work.; Prevailing Wages, through Article 4.; Sectionalizing Valve Replacement Project.; Building located at 5750 Almaden Expressway, San Jose, CA 95118.; “Bid/Submittal Drop Box,” located in front of the entrance door.; third-party contractor to complete internal inspections and repairs.; permits operation and maintenance of the pipelines and tunnels.; Houston.

Submission deadline

Not listed in the public preview.

Red flag teaser

4 red flags detected including Liquidated Damages.

Locked analysis

Full red flag list with excerpts

4 found

Liquidated Damages

high

…365 calendar days. See Contract Documents, Special Provisions, Article 12.03. Contract Time(s) for Milestones and Contract Times. 7. Liquidated Damages. See Standard Provisions, Liquidated Damages, Article 5.08. and Special Provisions, Liquidated Damages, Article 12.05. of the Contract Documents for requirements regarding Liquidated Damages. 8. Estimated Cost. The estimated cost of the Project is

Prevailing Wage / Certified Payroll

high

…t Bid Form No. 11, Project Labor Agreement Acknowledgement, at the time of Bid in order for its Bid to be considered responsive. 13. Prevailing Wage Requirements. A. Workers employed on this Project must be paid at rates at least equal to the prevailing wage rates as determined by the State of California Department of Industrial Relations pursuant to Section 1770 et seq. of the Labor Code. Said w

Project Labor Agreement / Union Requirements

high

…he bidding period. Addendum will be posted on the Valley Water Vendor Portal and each planholder will be notified automatically. 12. Project Labor Agreement. A. Valley Water and the Santa Clara and San Benito Counties Building and Construction Trades Council have entered into a Project Labor Agreement (PLA) approved by Valley Water’s Board of Directors on January 11, 2022. A Project Labor Agreeme

Owner Right to Reject All Bids

low

…ur local number: https://valleywater.zoom.us/u/aekffBkBma 16. Errors or Discrepancies in the Bids. Valley Water’s Board of Directors reserves the right to reject any and all Bid Proposals and to waive minor defects or irregularities in any submitted Bid Form(s). 17. Bidder’s Security. A. Each Proposal must be submitted electronically through the Valley Water Vendor Portal and accompanied by a Bid

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

4 items
  • Complete bid/proposal form
  • Acknowledge all addenda
  • Confirm prevailing wage / certified payroll requirements
  • Resolve before bid: Prevailing Wage / Certified Payroll

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all