BORDWELL PARK SITE IMPROVEMENT PLAN

Source scope cues include: City of Riverside; City of Riverside standards; Section 02540 - Resilient Surfacing – Engineered Wood Fiber…………………………………………………….; Product Data, Samples, Record Documents, Shop Drawing, etc.; Plumbing, Electrical Lighting, Concrete, HVAC, etc.; standard printed data is not suitable for use, submit as "Shop Drawings.; Replacements, Repairs, Guarantees and Warranty Work.; Supervision of a Licensed Pest Control Advisor who is licensed in the State of California.; Repair any and all damage to the turf that may occur.; repaired on an as-needed basis using new replacement parts to match existing.; replacement of all improvements that may become damaged as a result including all erosion.; 03 UTILITIES: All known underground utilities are noted on the Plans.; Existing Inactive/Abandoned Utilities: All miscellaneous inactive underground facilities (e.; Erosion Repairs, Guarantees and Warranty Work.; immediate and proper notification of the damage to the utility owner so that repairs can be made.; Contractor shall cooperate with the utility owner and provide access for repair work.; necessary to protect such utilities and structures from damage.; Replacement of Surface Improvements: Add the following to Standard Specifications Section 306-1.; 18540 Minthorn Street, Lake Elsinore, CA; 14111 Scottslawn Road, Marysville, Ohio; 201 Polito Avenue, Lyndhurst NJ.

BID WITH CAUTION 5 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside; City of Riverside standards; Section 02540 - Resilient Surfacing – Engineered Wood Fiber…………………………………………………….; Product Data, Samples, Record Documents, Shop Drawing, etc.; Plumbing, Electrical Lighting, Concrete, HVAC, etc.; standard printed data is not suitable for use, submit as "Shop Drawings.; Replacements, Repairs, Guarantees and Warranty Work.; Supervision of a Licensed Pest Control Advisor who is licensed in the State of California.; Repair any and all damage to the turf that may occur.; repaired on an as-needed basis using new replacement parts to match existing.; replacement of all improvements that may become damaged as a result including all erosion.; 03 UTILITIES: All known underground utilities are noted on the Plans.; Existing Inactive/Abandoned Utilities: All miscellaneous inactive underground facilities (e.; Erosion Repairs, Guarantees and Warranty Work.; immediate and proper notification of the damage to the utility owner so that repairs can be made.; Contractor shall cooperate with the utility owner and provide access for repair work.; necessary to protect such utilities and structures from damage.; Replacement of Surface Improvements: Add the following to Standard Specifications Section 306-1.; 18540 Minthorn Street, Lake Elsinore, CA; 14111 Scottslawn Road, Marysville, Ohio; 201 Polito Avenue, Lyndhurst NJ.

Submission deadline

Not listed in the public preview.

Red flag teaser

5 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

5 found

Back-Charge / Setoff Rights

high

…pleting previously noted corrections, or without preparing the system for inspection, the inspection may be cancelled and Contractor back charged for the direct costs of all City personnel time and consultant time lost, at the discretion of the Parks Department Representative. E. Closing in Uninspected Work: Do not allow or cause any of the Work of this Section to be covered up or enclosed until

Hazardous Material / Abatement Coordination

high

…e deflection of the pipe at each coupling (2-1/2 degrees each side) without ex-filtration or infiltration, cracking or breaking." C. Asbestos Cement Pipe (ACP): Add the following to Standard Specifications Section 212-2.1.6 Asbestos Cement Pipe and Fittings: (Note: Installation of new ACP shall not be a part of the project. This specification information is provided in the event connections to ex

Liquidated Damages

high

…shall be repaired, removed and/or replaced at the Contractor’s expense. The Contractor as specified in the Municipal Code shall pay liquidated damages in the amount of the appraised value of the tree(s). 5. At a minimum, any tree greater than 4" D.B.H. that is permanently damaged due to the construction project and not originally marked for removal shall be replaced with a new tree as identified…

Performance Bond Required

medium

…ion Section 02441 Grading Section 02210 1.04 GUARANTEE: The Contractor shall be required to provide a Labor and Materials Bond and a Performance Bond to guarantee the Park Site Maintenance Work. As a minimum the Bond amounts shall be equal to the sum of 100% of the bid amount for the Planting Work and 50% of the bid amount for the Irrigation Work. 1.05 SUBMITTALS: Submit copies of each of the fol

Sealed Hard-Copy Submission Requirement

medium

…nd title of related Specification Section; and, h) Drawing number and detail references, as appropriate. B. Transmittal: Provide one electronic copy (pdf) of each submittal to the Parks Department Representative using a transmittal form. Submittals received from sources other than Contractor may be returned without action. If a submittal is rejected, submit one copy of the re-submittal. 1.07 SUBM

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

4 items
  • Include performance bond
  • Verify workers compensation coverage
  • Include references or past project experience
  • Resolve before bid: Performance Bond Required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all