Bioassay Room Incubator Installation

Source scope cues include: PREVAILING WAGE -------------------------------------------------------------------------------------------- 5 O. INDEMNIFICATION; given by Inland Empire Utilities Agency.; INQUIRIES Technical inquiries regarding this solicitation should be directed to PlanetBids.; such services are repaired or corrected, and accepted, by the Project Manager.; in conjunction with this solicitation will be subject to prevailing wage.; components of proposed prices and/or invoices; i.; assessed by the Agency will be taken as a direct credit against the Contractor’s invoice for this project.; This laboratory is located at 6075 Kimball Ave Chino, CA.; 6075 Kimball Avenue, Chino CA; 6075 Kimball Ave.

BID WITH CAUTION 7 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: PREVAILING WAGE -------------------------------------------------------------------------------------------- 5 O. INDEMNIFICATION; given by Inland Empire Utilities Agency.; INQUIRIES Technical inquiries regarding this solicitation should be directed to PlanetBids.; such services are repaired or corrected, and accepted, by the Project Manager.; in conjunction with this solicitation will be subject to prevailing wage.; components of proposed prices and/or invoices; i.; assessed by the Agency will be taken as a direct credit against the Contractor’s invoice for this project.; This laboratory is located at 6075 Kimball Ave Chino, CA.; 6075 Kimball Avenue, Chino CA; 6075 Kimball Ave.

Submission deadline

2022-06-16

Red flag teaser

7 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

7 found

Broad Indemnification

high

…------------- 5 N. PREVAILING WAGE -------------------------------------------------------------------------------------------- 5 O. INDEMNIFICATION --------------------------------------------------------------------------------------------- 5 P. STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION ------------------------------- 5 Q. AWARD / SELECTION CRITERIA ----------------------------------

Liquidated Damages

high

…------ 6 R. BID PRICE --------------------------------------------------------------------------------------------------------- 6 S. LIQUIDATED DAMAGES -------------------------------------------------------------------------------------- 6 T. FORCE ACCOUNT WORK-------------------------------------------------------------------------------------- 6 SECTION 3 - SCOPE OF WORK ......................

Prevailing Wage / Certified Payroll

high

…------------------------------------------- 5 M. EQUAL EMPLOYMENT OPPORTUNITY AND HARASSMENT PROHIBITION ---------------------- 5 N. PREVAILING WAGE -------------------------------------------------------------------------------------------- 5 O. INDEMNIFICATION --------------------------------------------------------------------------------------------- 5 P. STANDARD SPECIFICATION FOR PUBLIC WOR

Bid Bond Required

medium

…icates within said time, his bid guarantee, if furnished, shall be returned to him within five (5) calendar days thereafter, and the bid bond, if furnished, shall become void. The bidder acknowledges and understands that a waiting period from time of bid opening until award may be ninety (90) calendar days during which bidder may not withdraw his bid. The bidder further acknowledges that he has a

High Insurance Limits Required

medium

…luding products and completed operations, property damage, bodily injury, and personal & advertising injury with limits no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Lia

Locked analysis

All deadlines table

1 dates
ItemDue
jvillalobos@ieua.org. Last Day for Questions will be Thursday, 2022-06-16

Locked analysis

Required certifications checklist

22 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all