← Public RFP analyses

Base Repair by Cold Planing

Source scope cues include: City of Sacramento to do; City of Sacramento; planetbids.com/portal/portal; BOND REQUIREMENTS: a. A faithful performance bond is: [ ] Not Required [X] Required If required, the successful bidder must submit a performance bond in a form approved by the C...; If necessary, the burden of proof and cost of analysis to or replacement.; Sacramento taxes, permits, or fees.; employee located in the city or unincorporated county of Sacramento.; awarding a contract for a public works project, using the online PWC-100 form.; MAINTENANCE AND REPAIR SERVICES AGREEMENT.; PREVAILING WAGE, APPRENTICES, PENALTIES, AND CERTIFIED PAYROLL REPORTING.; For replacement on the same day, in case of break down.; repairs, or waiting for the replacement equipment.; and acceptance of services and on receipt of Contractor's invoice.; manner designated in this Contract for: Base Repair by Cold Planing.; accordance with the schedule, set forth in the scope of services.; taxes, and shall provide CITY with proof of such payment upon request.; the general scope of this Contract consisting of additions, deletions, or other revisions.; insureds as respects auto liability..

BID WITH CAUTION 7 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento to do; City of Sacramento; planetbids.com/portal/portal; BOND REQUIREMENTS: a. A faithful performance bond is: [ ] Not Required [X] Required If required, the successful bidder must submit a performance bond in a form approved by the C...; If necessary, the burden of proof and cost of analysis to or replacement.; Sacramento taxes, permits, or fees.; employee located in the city or unincorporated county of Sacramento.; awarding a contract for a public works project, using the online PWC-100 form.; MAINTENANCE AND REPAIR SERVICES AGREEMENT.; PREVAILING WAGE, APPRENTICES, PENALTIES, AND CERTIFIED PAYROLL REPORTING.; For replacement on the same day, in case of break down.; repairs, or waiting for the replacement equipment.; and acceptance of services and on receipt of Contractor's invoice.; manner designated in this Contract for: Base Repair by Cold Planing.; accordance with the schedule, set forth in the scope of services.; taxes, and shall provide CITY with proof of such payment upon request.; the general scope of this Contract consisting of additions, deletions, or other revisions.; insureds as respects auto liability..

Submission deadline

Not listed in the public preview.

Red flag teaser

7 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

7 found

Broad Indemnification

high

…ontract is for specialized legal services if in the best interest of the City. 9. In consideration of the foregoing, I shall defend, indemnify and hold harmless, the City, its officers and employees, against any claims, actions, damages, costs (including reasonable attorney fees), or other liabilities of any kind arising from any violation of the City’s Equal Benefits Requirements or of the Ordin

Liquidated Damages

high

…not be entitled to receive any compensation for services rendered after such termination and CONTRACTOR shall be liable to CITY for liquidated damages for all periods of time beyond such termination date until the work is completed. 13.2 If CONTRACTOR should abandon the work, or if the work or any portion of the Work should be sublet or assigned without the consent of CITY, or if the Project Mana

Prevailing Wage / Certified Payroll

high

…gistered with the DIR pursuant to Labor Code section 1725.5. The prime contractor is required to post job site notices, as as prescribed by regulation, including copies of applicable DIR wage determinations. (Labor Code section 1771.4(a)2)). The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. (Labor Code section 1771.4(a)(1)). Page 8 of 5

Project Labor Agreement / Union Requirements

high

…ssary and may not exceed three (3) months from the date the Contract is executed with the City. g. Until the expiration of a current collective bargaining agreement(s) where, in fact, employee benefits are governed by a collective bargaining agreement(s). h. I take all reasonable measures to end discrimination in employee benefits by either requesting the union(s) involved agree to reopen the agr

High Insurance Limits Required

medium

…policy shall include a waiver of subrogation for contracts involving construction or maintenance, or if required by the CITY by selecting the option below: __X___ Workers’ Compensation waiver of subrogation in favor of the City is required for all work performed by the CONTRACTOR. No Workers’ Compensation insurance shall be required if CONTRACTOR completes the following certification: Page 6 of 5

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

17 items
  • Complete bid/proposal form
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all