← Public RFP analyses

Asbestos Abatement and Demolition Services for MWD Skinner SD Turnout/Canal Cottage

Source scope cues include: Department of General Services; PlanetBids system by the date and time specified.; invoices are paid within the discount terms (all discounts are taken).; calendar days after receipt of invoice by Metropolitan.; Metropolitan may, at its option, verify the correctness of the invoice.; the withholding of Contractor’s invoice payment.; insured would be invalid under Subdivision (b) of Section 2782 of the Civil Code.; specialized permits or licenses on Metropolitan’s premises have a valid license to do so.; the scope of services, and timetable for completion of services.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; comply with all required permits and licenses.; scope to those requested in this Request for Bids.; Agreement Administrator proof of labor compensation rates being paid or paid.; other evidence of the cost of special services in lieu of itemized invoices.; allowance of five (5) percent will be added to invoices for special services.; and shall retain copies of the permits at the site.; Manager and others as needed during which the Project Plan will be reviewed.; Water Treatment Plant; 33740 Borel Road, Winchester, CA; 33740 Borel Road.

BID WITH CAUTION 14 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Department of General Services; PlanetBids system by the date and time specified.; invoices are paid within the discount terms (all discounts are taken).; calendar days after receipt of invoice by Metropolitan.; Metropolitan may, at its option, verify the correctness of the invoice.; the withholding of Contractor’s invoice payment.; insured would be invalid under Subdivision (b) of Section 2782 of the Civil Code.; specialized permits or licenses on Metropolitan’s premises have a valid license to do so.; the scope of services, and timetable for completion of services.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; comply with all required permits and licenses.; scope to those requested in this Request for Bids.; Agreement Administrator proof of labor compensation rates being paid or paid.; other evidence of the cost of special services in lieu of itemized invoices.; allowance of five (5) percent will be added to invoices for special services.; and shall retain copies of the permits at the site.; Manager and others as needed during which the Project Plan will be reviewed.; Water Treatment Plant; 33740 Borel Road, Winchester, CA; 33740 Borel Road.

Submission deadline

2017-03-17

Red flag teaser

14 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

14 found

Broad Indemnification

high

…age shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under Subdivision (b) of Section 2782 of the Civil Code. g. Other Endorsements and Insurance Provisions 1. Automobile Liability Endorsement. The policies are to contain, or be endorsed to contain Endorsement MCS-90 f

Hazardous Material / Abatement Coordination

high

METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA REQUEST FOR BID RFB-AS– 326066 ASBESTOS ABATEMENT/DEMOLITION PROJECT FOR METROPOLITAN SKINNER SD TURNOUT/CANAL COTTAGE KEY ACTION DATES REQUEST FOR BIDS (RFB) ISSUED ..................................................... March 6, 2017 MANDATORY JOB WALK ..................................... March 15, 2017at 10:00 a.m. PST. RFB QUESTIONS DUE........

Liquidated Damages

high

…forming a public contract or transaction. If yes, attach a separate sheet with a detailed explanation. Yes No _____ c. Been assessed liquidated damages under a construction project. If yes, attach a separate sheet with a detailed explanation. Yes No _____ d. Been convicted of any criminal charge in connection with obtaining, attempting to obtain, or performing a public contract or transaction. If

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…nt all bidders must: 1. Carefully read the entire RFB. 2. Bidders must have attended the mandatory job walk in order to be eligible. Failure to attend renders a bid non-responsive. Metropolitan will not accept bids from Bidders who did not attend the Mandatory Job Walk. 3. Ask questions and submit all inquiries by the required date and time. 4. Ensure that all procedures and requirements of this

Prevailing Wage / Certified Payroll

high

…notice at job site. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations 4. PREVAILING WAGES (a) In accordance with the provisions of the California Labor Code, the Board of Directors of Metropolitan has obtained from the Director of Industrial Relations of the State of California his determination of the general prevailing rates of per diem

Locked analysis

All deadlines table

2 dates
ItemDue
RFB QUESTIONS DUE............................................ 2017-03-17
BID SUBMITTAL DUE ............................................ 2017-03-23

Locked analysis

Required certifications checklist

25 items
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all