Airports Department Job Order Contracting (JOC) for General Engineering, General Building Construction, HVAC Construction, Electrical Construction, or Low Voltage Systems Construction

Source scope cues include: GENERAL ENGINEERING, GENERAL BUILDING CONSTRUCTION, HVAC CONSTRUCTION, ELECTRICAL CONSTRUCTION, OR LOW VOLTAGE SYSTEMS CONSTRUCTION; CONSTRUCTION, HVAC CONSTRUCTION, ELECTRICAL CONSTRUCTION, OR LOW VOLTAGE SYSTEMS CONSTRUCTION BID FILE NUMBER: 12600201; City of Fresno; City of Fresno has adopted; Prevailing Wage Rates ................................................................................... 2.34 Payrolls Records .......; sealed proposal; Employment of Labor/Prevailing Wage Rates .; Thereafter, as projects are identified the Contractor will jointly scope the work with the City.; prepare a Detailed Scope of Work and issue a Request for Proposal to the Contractor.; then click on “Fresno Municipal Code and City Charter” located to the right of the page.; Certification Program (CUCP) data base at https://californiaucp.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; makes findings in a Resolution setting forth facts constituting the emergency or necessity.; professional licensed in the State of California to provide design services.; Scope of Work within the Job Order Completion Time for the Job Order Price.; A site meeting to discuss the work before the Detailed Scope of Work is finalized.; OWNER’S determination shall also define if warranty period begins for the work being accepted.; Bid Security, faithful performance bond and/or payment bond.; 2600 Fresno Street, Fresno, California; 3132 Bradshaw Road, P. O. Box; 2600 Fresno Street, Fresno CA.

BID WITH CAUTION 26 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: GENERAL ENGINEERING, GENERAL BUILDING CONSTRUCTION, HVAC CONSTRUCTION, ELECTRICAL CONSTRUCTION, OR LOW VOLTAGE SYSTEMS CONSTRUCTION; CONSTRUCTION, HVAC CONSTRUCTION, ELECTRICAL CONSTRUCTION, OR LOW VOLTAGE SYSTEMS CONSTRUCTION BID FILE NUMBER: 12600201; City of Fresno; City of Fresno has adopted; Prevailing Wage Rates ................................................................................... 2.34 Payrolls Records .......; sealed proposal; Employment of Labor/Prevailing Wage Rates .; Thereafter, as projects are identified the Contractor will jointly scope the work with the City.; prepare a Detailed Scope of Work and issue a Request for Proposal to the Contractor.; then click on “Fresno Municipal Code and City Charter” located to the right of the page.; Certification Program (CUCP) data base at https://californiaucp.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; makes findings in a Resolution setting forth facts constituting the emergency or necessity.; professional licensed in the State of California to provide design services.; Scope of Work within the Job Order Completion Time for the Job Order Price.; A site meeting to discuss the work before the Detailed Scope of Work is finalized.; OWNER’S determination shall also define if warranty period begins for the work being accepted.; Bid Security, faithful performance bond and/or payment bond.; 2600 Fresno Street, Fresno, California; 3132 Bradshaw Road, P. O. Box; 2600 Fresno Street, Fresno CA.

Submission deadline

2025-09-30

Red flag teaser

26 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

26 found

Back-Charge / Setoff Rights

high

…this determination is given to the Contractor, a substantial monetary penalty, on account of the NTH violation, may be withheld and set off by the Finance Department from progress payments, or the final payment, due to the Contractor for work performed under the Contract. Depending upon the seriousness or willfulness of the NTH violation, the amount of money which may be withheld may be up to, bu

Broad Indemnification

high

…m the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker. If a Bidder refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be fin

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

…equired to report to the Federal Aviation Administration (FAA) on DBE participation for all Federal-aid contracts each year so that attainment efforts may be evaluated. (ix) Foreign Trade Restriction (Reference: 49 CFR part 30) (x) Lobbying Federal Employees (Reference: 31 USC § 1352 – Byrd Anti-Lobbying Amendment; 2 CFR Part 200, Appendix II(I); 49 CFR Part 20, Appendix A) iv Airport JOC 547313v

Hazardous Material / Abatement Coordination

high

…bligations, OWNER, in its sole discretion, may reduce the total Job Order Price or set-off the amount against payments due. Item 61. ASBESTOS CONTAINING MATERIALS (a) Should removal of asbestos containing materials be part of the Project, decontamination and removal will meet the following criteria: (1) Decontamination and removal of work found to contain asbestos or work installed with asbestos

Lien Waiver / Waiver of Lien Rights

high

…g information with the application for payment: (1) certified payrolls covering the period of the prior application for payment; (2) unconditional waivers and releases from all Subcontractors/suppliers for which payment was requested under the prior application for payment; (3) receipts or bills of sale for any items. (4) confirmation that the maintenance of the Record Drawings is being kept up-t

Locked analysis

All deadlines table

2 dates
ItemDue
SCHEDULED BID OPENING: Tuesday, 2025-09-30
A MANDATORY pre-bid conference will be held via Zoom at 10:00 a.m., on 2025-09-09

Locked analysis

Required certifications checklist

28 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all