3rd Street Relief Sewer

Source scope cues include: City of Sacramento Non; City of Sacramento; planetbids.com/portal/portal; sealed proposal; Parts One and Two should be submitted in separate sealed envelopes.; to present a complete and detailed cost estimate and allow a detailed cost review.; costs, contingencies, and mark-up, as applicable, are allocated.; The highest ranked Proposer shall submit their EBPDs in a sealed container (e.; envelope, box or carton sealed with tape, locked strongbox, etc.; agent, the EBPDs will be stored by the City’s Department of Utilities in its offices.; to complete the Project, including construction, start-up, and warranty services.; Parts One and Two sealed envelope outlined in Item A.; Identify if subcontractor is self-insured for Workers Compensation Insurance in California.; regulations promulgated by the City Department of Utilities.; Only one WMP is required if a project has multiple building permits associated to it (i.; subdivision, or multiple related permits at one address).; New City Hall, located at 915 I Street, 5th Floor, Mayor’s Reception Desk, up to the hour of 3:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; 2812 Meadowview Road, Building; 1 LS Street.

BID WITH CAUTION 21 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento Non; City of Sacramento; planetbids.com/portal/portal; sealed proposal; Parts One and Two should be submitted in separate sealed envelopes.; to present a complete and detailed cost estimate and allow a detailed cost review.; costs, contingencies, and mark-up, as applicable, are allocated.; The highest ranked Proposer shall submit their EBPDs in a sealed container (e.; envelope, box or carton sealed with tape, locked strongbox, etc.; agent, the EBPDs will be stored by the City’s Department of Utilities in its offices.; to complete the Project, including construction, start-up, and warranty services.; Parts One and Two sealed envelope outlined in Item A.; Identify if subcontractor is self-insured for Workers Compensation Insurance in California.; regulations promulgated by the City Department of Utilities.; Only one WMP is required if a project has multiple building permits associated to it (i.; subdivision, or multiple related permits at one address).; New City Hall, located at 915 I Street, 5th Floor, Mayor’s Reception Desk, up to the hour of 3:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; 2812 Meadowview Road, Building; 1 LS Street.

Submission deadline

2019-06-11

Red flag teaser

21 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

21 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…erformed at the time and in the manner therein specified, and in all respects according to their true intent and meanings, and shall indemnify and save harmless the City, its officers, employees and agents, as therein provided, then this obligation shall be null and void; otherwise shall be and remain in full force and effect. This obligation shall remain in full force and effect until (1) the da

Hazardous Material / Abatement Coordination

high

UNIONS ______________________________ __________________________________ Asbestos Workers Local #16 Iron Workers Local #118 __________________________________ __________________________________ Bricklayers Local #3 Laborers Local #185 __________________________________ __________________________________ Boilermakers Local #549 Operating Engineers Local #3 __________________________________ _______

Liquidated Damages

high

…ope II 1. Bid Proposal Pricing Schedule 2. LBE Participation Form 3. Bid Deposit & Bid Proposal Guarantee Exhibits Required for Execution of Agreement A. LBE Information B. Notice to Contractors C. Department of Industrial Relations Registration and Reporting Requirements (SB 854) D. Ban the Box Requirements E. Notice Regarding Assembly Bill 626 F. Liquidated Damages G. Payment & Performance Bond

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…quest for Proposals issued .......................................................................................... March 12, 2019 Mandatory Pre-Proposal meeting .................................................................................... March 21, 2019 Last Day to Ask Questions ....................................................................................................A pril 3,

Locked analysis

All deadlines table

5 dates
ItemDue
Anticipated Award of Contract by City Council ................................................................... 2019-06-11
Proposals must be received by 3:00 pm on 2019-04-18
Mandatory Pre-Proposal meeting .................................................................................... 2019-03-21
Last Addendum Posting ............................................................................................. 2019-04-11
(i) This section shall remain in effect only until 2020-01-01

Locked analysis

Required certifications checklist

25 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all