← Public RFP analyses

2023/2024 CDBG STREET IMPROVEMENTS

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Utilities; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Riverside Public Utilities Electric Division Specification No.; Riverside Public Utilities Water Division Specification No.; properly licensed in accordance with the laws of this state.; except for when the grade of curb and gutter is less than 0.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; and/or relocated shall be measured, marked, and identified in the field.; operations except that the minimum size replacement will be a No.; completely cleaned of deleterious material using a blower or an air compressor.; treatment method shall be called “Crack Repair.; 2024 CDBG STREET; 3900 Main Street, Riverside, CA.

BID WITH CAUTION 15 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Utilities; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Riverside Public Utilities Electric Division Specification No.; Riverside Public Utilities Water Division Specification No.; properly licensed in accordance with the laws of this state.; except for when the grade of curb and gutter is less than 0.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; and/or relocated shall be measured, marked, and identified in the field.; operations except that the minimum size replacement will be a No.; completely cleaned of deleterious material using a blower or an air compressor.; treatment method shall be called “Crack Repair.; 2024 CDBG STREET; 3900 Main Street, Riverside, CA.

Submission deadline

2024-02-05

Red flag teaser

15 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

15 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under this Agreement. Written notice to Contractor of such withholding and offset shall promptly be given by City. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…ty is always hereby relieved from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims, or actions arising from or in connection with said indebtedness. 3-2 SELF PERFORMANCE. Replace Subsection 3-2 with the following language: The Contractor shal

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

CITY OF RIVERSIDE FINANCE DEPARTMENT, PURCHASING DIVISION REQUEST FOR BIDS BID NO. 8049 2023/2024 CDBG STREET IMPROVEMENTS The City of Riverside Public Utilities Department has determined bidders shall hold a valid Class “A - General Engineering Contractor” or “C-12 Paving, Earthwork Contractor” State of California Contractor’s license in good standing. BID BOND OR CASHIERS CHECK IS REQUIRED WITH…

Hazardous Material / Abatement Coordination

high

SPECIAL CONDITIONS PERTAINING TO HAZARDS, SAFETY STANDARDS AND ACCIDENT PREVENTION A. Lead-Based Paint Hazards (Applicable to contract for construction or rehabilitation of residential structures.) The construction or rehabilitation of residential structures is subject to all HUD Lead- Based Paint regulations including The Lead-Based Paint Poisoning Prevention Act of 1971, The Residential Lead-Bas

Liquidated Damages

high

…layed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract. 6-9 LIQUIDATED DAMAGES. The following Liquidated Damages are applicable to the completion of this project. All liquidated damages indicated shall not be construed as a penalty, and may be deducted from payments due Contractor if such incidents occur: 1. Liquidated damag

Locked analysis

All deadlines table

4 dates
ItemDue
Release of Bid No. 8049 2024-02-05
Online Questions Deadline 2024-02-15
Online Questions Responses 2024-02-22
Bid Due 2024-02-29

Locked analysis

Required certifications checklist

24 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all