← Public RFP analyses

2023-2024 Median Landscaping Improvements

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; replacement in accordance with the Plans in order to provide proper watering.; Pressure calculations shall be submitted by a licensed landscape architect.; day warranty period will be required for all plantings.; liquidatable incidents per working day.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; and/or relocated shall be measured, marked, and identified in the field.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, California..

BID WITH CAUTION 14 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; replacement in accordance with the Plans in order to provide proper watering.; Pressure calculations shall be submitted by a licensed landscape architect.; day warranty period will be required for all plantings.; liquidatable incidents per working day.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; and/or relocated shall be measured, marked, and identified in the field.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, California..

Submission deadline

2024-08-13

Red flag teaser

14 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

14 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…- CONTROL OF THE WORK 3-1 ASSIGNMENT. 3-1.1 Contractor Indebtedness. Indebtedness incurred for any cause in connection with this work must be paid by the Contractor and the City is hereby relieved at all times from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless Bid 8066 - Special Provisions.docx Part 1, Page 9 8/9/202

Liquidated Damages

high

…nutes of notification of the superintendent or superintendent's office. For each incident of failure to comply with this requirement liquidated damages will be assessed as described in Section 6-9 of these Special Provisions. An incident is described as follows: The Engineer shall notify the Superintendent by phone to meet with the Engineer at a specific location at one of the project sites. An i

Prevailing Wage / Certified Payroll

high

…will also comply with the following sections of the California Labor Code: a. Section 1775 prescribing sanctions for failure to pay prevailing wage rates; b. Section 1776 requiring the making, keeping and disclosing of detailed payroll records and prescribing sanctions for failure to do so; c. Section 1777.5 prescribing the terms and conditions for employing registered apprentices; d. Section 181

Project Labor Agreement / Union Requirements

high

…rating similar equipment already on the project or, in the absence of such other workers, at the rates for such labor established by collective bargaining agreements for the type of workers and location of the work, whether or not the owner-operator is actually covered by such an agreement. Copies of the "Labor Surcharge and Equipment Rental Rates" publication are available online at: https://dot

Locked analysis

All deadlines table

5 dates
ItemDue
Bid Released 2024-08-13
Online Questions Deadline 2024-08-27
Online Questions Responses 2024-09-03
Bid Due 2024-09-10
Bid 8066 - Special Provisions.docx Part 1, Page 3 2024-08-09

Locked analysis

Required certifications checklist

25 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all