← Public RFP analyses

14th St and Vine St Storm Drain Improvements Portable Storm System

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Riverside Public Utilities Water Division Specification No.; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; matters within the Scope of the protest provisions in Section 6-3.; with the exception of when the grade of curb and gutter is less than 0.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; and/or relocated shall be measured, marked, and identified in the field.; are to be removed or relocated will be paid for separately.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, California..

BID WITH CAUTION 15 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Riverside Public Utilities Water Division Specification No.; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; matters within the Scope of the protest provisions in Section 6-3.; with the exception of when the grade of curb and gutter is less than 0.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; and/or relocated shall be measured, marked, and identified in the field.; are to be removed or relocated will be paid for separately.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, California..

Submission deadline

2026-03-24

Red flag teaser

15 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

15 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…hereby relieved at all times from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 3-2 SELF-PERFORMANCE. Replace Subsection 3-2 with the following language: The Contractor shall

HIPAA / Healthcare Data Privacy Compliance

high

1111....666699995555 Material Unit Weight Strength Cohesion Phi Color Name (lbs/ft3) Type (psf) (deg) Silty Mohr‐ Sand 115 0 34 Coulomb (SM) Concrete 150 Undrained 15000 0 10 20 30 40 50 60 70 80 90 100 Project City-wide Street, Storm Drain and Sewer Improvements Group Group 1 Scenario Static Drawn By Zahangir Alam Company Converse Consultants Date 11/9/2021 File Name RW.slmd SLIDEINTERPRET 9.008…

Liquidated Damages

high

…stored in public streets and right-of-way. If the Contractor does not adhere to this requirement, the Contractor shall be subject to Liquidated Damages as described in Section 6-9 of these Special Provisions. Excavated material, except that which is to be used as backfill in the adjacent trench, shall not be stored in public streets and right-of-way unless otherwise specified in these Special pro

Prevailing Wage / Certified Payroll

high

…will also comply with the following sections of the California Labor Code: a. Section 1775 prescribing sanctions for failure to pay prevailing wage rates; b. Section 1776 requiring the making, keeping and disclosing of detailed payroll records and prescribing sanctions for failure to do so; c. Section 1777.5 prescribing the terms and conditions for employing registered apprentices; d. Section 181

Locked analysis

All deadlines table

3 dates
ItemDue
Online Questions Deadline 2026-03-24
Online Questions Responses 2026-03-31
Bid Due 2026-04-07

Locked analysis

Required certifications checklist

24 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all